Laserfiche WebLink
<br />HISTORICAL COMMISSION MEETING MINUTES <br />February 19, 2014 <br />Call to Order: <br /> A public meeting of the Historical Commission was held in Cary Hall at the Ellen Stone <br />February 19, 2014 <br />Room, 1605 Massachusetts Avenue, Lexington, MA on . <br />7:30PM <br />The meeting convened at . <br />Historical Commission Members in Attendance: <br />Mr. David Kelland, Ms. Marilyn Fenollosa, Mr. Frank Kern, Ms. Sally Zimmerman, Mr. Wendall Kalsow <br />AGENDA ITEM #1 <br /> (Time: 7:30 PM) <br />Public Hearing on Partial Building Demolition Application for 44-46 Parker Street <br />APPLICANT(S) PRESENT: <br />Mr. Sean Glynn for Galway Realty LLC, PO Box 653, Reading, Ma 01867 <br />th <br />Mr. Jon Seward, Architect-Planner/Principal, Community Design Partnership, 369 Congress Street, 8 <br />Floor, Boston, Ma 02210 <br />ABUTTER(S) PRESENT: <br />Homeowner from 7 Jackson Court <br />The couple read from a letter they sent to Mr. Seward and Mr. Galway. They expressed that they both <br />supported the project and were encouraged by the sensitivity both Mr. Seward and Mr. Galway showed to <br />the abutters. The abutters also stated they felt communication to the neighbors about the project was good. <br />DOCUMENT(S): <br />Structural Report dated February 8, 2014 from Leon A. Bombardier, PE, 131 Lincoln Street, Abington, Ma <br />02351 <br />Certified Plot Plan Boston Survey Inc. Unit C-4 Shipways Place Charlestown, Ma 02129 <br />Stefanov Architects: 516 East Second Street #32 Boston, Ma 02127 <br />Front and Rear Elevations of Existing and New Conditions <br />Garage and Breezeway Plan and Elevations <br />First and Second Floors Existing Conditions Plans with Demolition <br />Site Setback Plan <br />West and South Elevation <br />East and North Elevations <br />First and Second Floors Renovation Plans <br />Basement and Third Floors Renovations Plans <br />13 Photos of the exterior and garage <br />SUMMARY: <br />The residential building is a two story wood framed building with a stone masonry foundation and full <br />basement. The attic space is partially finished for occupancy. The building is currently unoccupied. It was <br />stated that the original structure was thought to be a barn moved onto this site. <br />Mr. Glynn explained that the house has several structural limitations that should be corrected. Mr. Glynn <br />and Mr. Steward stated the front steps are in need of repair, the garage in the rear of the house is in bad <br />condition and will be demolished and the rear porch should be removed and if reconstructed, installed on <br />proper foundations. The proposed work is also to include transforming this two family house into a single <br />family structure and adding a small porch onto the lower left front. <br />1 <br /> <br />