|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-02-12-DAC-Letter-Kiln Brook signs
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Design Advisory Committee-DAC
>
Minutes
>
2010-2020
>
2014
>
2014-02-12-DAC-Letter-Kiln Brook signs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 9:57:09 AM
Creation date
2/13/2014 9:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LDAC <br />EXINGTONESIGNDVISORYOMMITTEE <br />February 12, 2014 <br />To: Board of Appeals <br />Re: Kiln Brook – 70 Westview St., 20 Maguire Rd. & 81 / 83 Hartwell Ave., Lexington, MA <br /> Sign application - modifications to existing signs <br />The DAC reviewed the proposed modifications to the existing signs at our regular meeting 10 February 2014 and <br />had the following comments and recommendations. <br />1.The DAC approved of the design solution, materials, color and overall scale and appearance of the signs <br />for this specific location. <br />2. <br />Although internally illuminated signs are not permitted the DAC agreed that the use of LED lamps is <br />appropriate and offers the least impact and most sustainable solution for this location. <br />The following documents/exhibits were presented and reviewed at the meeting: <br />1.Exterior Site Signage package produced by Advanced Signing Drawing No's. A01-A.1 – A.8, REV.10- <br />30-13, Site.2 Rev. 7-22-13, A01-B.1 – B18 Rev. 10-30-13, Site.4 & Site 4a Rev. 7-22-13, A01-C.1 – C.8 <br />Rev. 10-30-13, Site.1 Rev. 7-22-13 <br />The Design Advisory Committee recommends approval of this application. If further changes are made to the <br />plan or final installation the DAC asks that the applicant notify the DAC for review and approval prior to <br />implementation. <br />Respectfully submitted, <br />Timothy D. Lee <br />Chairman <br />Lexington Design Advisory Committee <br />Cc: Peter Kelley - Board of Selectmen Liaison <br /> Nancy Corcoran-Ronchetti - Planning Board Liaison <br /> Aaron Decarolis, Applicant representative <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.