|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-08-21 CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2013
>
2013-08-21 CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:15:43 PM
Creation date
1/2/2014 2:54:37 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TOWN OF LEXINGTON, MASSACHUSETTS <br />CONSERVATION COMMISSION <br />MINUTES <br />Tuesday, August 21, 2013 <br />6:30 P.M. <br />Legion Room, Cary Hall <br />1625 Massachusetts Avenue <br /> <br /> <br />Vice Chairman Phil Hamilton opened the meeting at 6:33 pm in the Legion Room of <br />Cary Hall. <br /> <br />Commissioners Present: Phil Hamilton, Stew Kennedy, Jane Warren, Duke Bitsko, and <br />David Langseth <br /> <br />Commissioners Absent: Joyce Miller and Dick Wolk <br /> <br />Others Present: Karen Mullins, Conservation Administrator and Michelle Tassi, <br />Community Development Department Assistant <br /> <br />6:33 pm Meeting – RDA, Lincoln Field <br /> DET# 13-15 <br />Pathway reconstruction within the 100-foot Buffer Zone to Bordering <br />Vegetated Wetland <br />Documentation: RDA Application 7/24/2013 <br />Present for the Applicant: Marc Valenti, Lexington Department of Public <br />Works <br /> <br />Mr. Valenti described the second phase of the pathway reconstruction at <br />Lincoln Field. <br /> <br /> Comments from the Commission as follows: <br />Mr. Hamilton asked for clarification on the map that contains the zoomed <br />in area. Mr. Valenti identified the areas on the map that were in question. <br />Mr. Langseth suggested that additional details need to be provided before <br />issuing a negative determination. Mr. Kennedy asked the purpose of <br />raising the elevation. Mr. Valenti explained that it will be pitched so the <br />runoff naturally flows off of the pathway. Mr. Langseth stated that the <br />removal of accumulated sediment should be included in this project. <br /> <br />Motion made and seconded to continue this meeting to September 10, <br />2013 at an unspecified time, 5-0 in favor. <br /> <br />6:53 pm Cont. Hearing – NOI, 361 North Emerson Road <br /> DEP# 201-905, BL 865 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.