Laserfiche WebLink
t�VS MOght <br />o� 1775 <br />ti O� <br />., APRIL I9' <br />APPROVED MEETING MINUTES <br />Committee Name: Lexington Bicycle Advisory Committee <br />Date, Time and Location of Meeting: September 12, 2013, 7 pm, Town Office Building <br />Members Present: Peggy Enders (Chair), Bob Hausslein (FoLB Chair), Bob Dangel, George Gagliardi, <br />Sandra Shaw (Recreation Committee Liaison), Marita Hartshorn, Stew Kennedy, Richard Canale, <br />(Planning Board Liaison). <br />Members Absent: Patria Lanfranchi, Mike Tabaczynski, John Frey. <br />August Meeting Minutes: The August Minutes were approved as submitted <br />Minuteman Bikeway: Paving Recommendations: Peggy and Bob Hausslein walked the bikeway and, <br />with additional comments from Bob Dangel, submitted to John Livsey a section -by- section accounting of <br />Bikeway conditions and recommendations; Mr. Livsey had asked for this information as the DPW <br />considers the roadway program for the next year. Richard Canale pointed out that the Town has a town <br />wide paving program; he encouraged the committee to ask, "Does the Bikeway fit into this master plan or <br />do we need to advocate for paving independently ?" The Bikeway is rapidly degrading. If the town <br />considers the Bikeway a great resource, it is important to maintain its pavement much as is done on town <br />streets. The committee urged Peggy and Bob to meet with John Livsey and Bill Hadley to review the <br />draft. Bob Dangel offered to map out the distances involved in each recommendation. <br />Toole Design Group Report: Toole will present their draft report, "Navigating the Minuteman Bikeway," <br />to the Transportation Forum group on Tuesday, October 8 at 900 a.m. The report provides detailed <br />recommendations for improvements in terms of user information ( "wayfinding ") and safety. Peggy urged <br />all members to attend this presentation. It is not clear how funding will be secured for the next phase of <br />the project or how the towns will collaborate on aspects of the report that involve all Bikeway towns. <br />Bike Racks: The MAPC bike rack program has been discontinued. Peggy has written to urge the town <br />to factor future bike rack purchases in the town and school budgets, to both replace and add to the <br />current inventory. Currently an additional rack is needed behind CVS as well as to replace the one <br />behind the Depot and the one at Hastings Park. In the interim perhaps the town could move the little - <br />used bike rack from the Adams School tennis court. Benches in town are very popular and citizens <br />readily contribute to these; perhaps the committee should encourage people to donate bike racks as was <br />done earlier with bike racks behind the Depot and at the library. The library bike racks are frequently <br />overflowing. <br />Membership Renewals: Stew, Mike, and Bob Hausslein have all agreed to serve for at least three more <br />years on the Bike Committee. <br />Bikeway Counts were held today and will continue on Saturday, September 14 <br />