Laserfiche WebLink
Lincoln Park Sub - Committee Meeting <br />November 29, 2012 <br />Present: David Williams, Lynne Wilson, Nell Walker, Brian Kelly, Bob Pressman,Wes Wirth, Wirth <br />Associates, Karen Simmons, Director of Recreation, Wendy Rudner, liaison <br />• Karen: <br />• . Memorial Donation signage plague needs brass to be cleaned and new plexiglass, as it is <br />smoky /poor visibility, and disservice to all. <br />• • After a brief discussion Lynne said Sub - committee should fix it. <br />• • Wes will contact someone he knows who will do this. <br />• Map signage presented by Wes: <br />• • New, space -age quality of sign - digital printing, won't fade, graffiti- proof, non - scratch <br />• • Karen noted how town often has destruction of property <br />• • Nell noted that interpretive signs look poor and storm resulted in fallen trees on paths <br />• • Karen said to call Chris Filadoro. <br />• • Wes will do so. <br />• - Place at high school entry, Lincoln Park entry, and smaller sign at Kirk Grove <br />• • Wes displayed full size Nature Path plan. Changes are: <br />• • Remove pictures, then move title over <br />• • Specify Theresa and Roberta Lee path on the map and add to green box at bottom of map <br />• • Place + - by mile, 1/2 mile <br />• • Add - to Bridge School <br />• • Add - to Res. <br />• • Add Kirk Redwood Grove <br />• • Add "Lower Vinebrook" <br />• • Show paths in Woodland Garden paths <br />• • At Plaza, add different sign to highlight azaleas, etc. <br />• • Change color green to a bit darker <br />• • Change titles to red, not white <br />• Change title to Nature and Fitness Path and make lettering bigger <br />• Granite slabs: <br />• • Twelve slabs of varying lengths, from Dana Home's foundation, found by David Williams, now <br />dropped off in Pat's Meadow area <br />• . Wes proposed two examples: <br />• • Possibly stack in circular formation <br />• • Possibly sl. elevated, at top of raised path at Poplar Grove area, some for sitting, some tall, <br />• with paved pathway to/from <br />• . Discussion, then agreement on structure layout: <br />• • 40" x 40" area, with granite on both sides of a middle pathway <br />• • Brian will ask Mark McCullough to about installation - drill hole, secure pipe in granite and <br />• secure structure in concrete <br />• • Karen suggested possibly using CPC funds to install <br />• • Put information on the new signs - Wes wanted to call structure "Landfill ". <br />• Brian regarding bathroom progress: <br />• • Jim McLaughlin dug hole, fenced in area <br />• • Brian will place a needed slab of aluminum before Monday <br />