Laserfiche WebLink
LINCOLN PARK SUB-COMMITTEE <br />Minutes April 18, 2013 <br />Members present— Lynne Wilson, acting Chair, Brian Kelley, Bob Pressman <br />Others present —Wendy Rudner, Recreation, Vanessa Tropeano, Parterre, Wesley Wirth, Landscape <br />Architect, Miles Connors, Parterre <br />Lynne opened the meeting at 4:35. Minutes from November 29, 2012, and from March 21, 2013 were <br />read and accepted. <br />Wes Wirth reported that we have received 30 blue spruce trees from the Town that will be planted in <br />three locations. He will need water and will ask Chris Filadora about turning on the water. <br />Parterre will be on location every other Tuesday. May 7 would be the best day for the planting. <br />Miles reported that the cherry trees on Worthen Road are diseased. They need thinning, pruning and <br />treatment. <br />Granite Forest Wes still has not received an estimate from Mark McCullough. When he gets it, he will <br />email it to all. <br />Signage — Wes has a quote from Fossil Graphics - $1200 per sign and stand. We will need holes and <br />concrete for installation. He asked the committee to read the text and get back to him as soon as <br />possible. <br />Vanessa told the group that she has distributed some of our brochures, and that we need a data base to <br />notify people of what is happening or in bloom. Patch would be an option as would be the Town's <br />website. We could add images. Wendy will talk to Karen Simmons, Recreation, and email Wesley. This <br />would give people about 5 times to visit starting when the azaleas and crabapples are in bloom. <br />She showed plant lists which would give color from spring until fall. She wanted to add about 50 bare <br />root birch. She will get back to the group with costs. <br />Mlles said that he would like to take down some Norway maples and spray the onion grass. He will call <br />Karen Mullins, Conservation, about the grass. <br />Wes said that the drainage along the cart path continues to be an issue. The path along Worthen Road <br />needs to be widened. He will get an estimate from Bob Barnard. <br />Bathrooms — Brian Kelley reported that construction was going well and within budget. Hopefully, they <br />will be completed by July 4. <br />The meeting was adjourned at 5:40 pm. <br />Respectfully submitted, <br />