Laserfiche WebLink
LINCOLN PARK SUB-COMMITTEE <br />Minutes March 21, 2013 <br />Members present —David Williams, Chair, Nell Walker, Lynne Wilson, Brian Kelley, Bob Pressman <br />Others present — Wesley Wirth, Landscape Architect, Vanessa Tropeano, Parterre Garden Services, <br />Myles Connors, Parterre, Wendy Rudner, Recreation <br />The Chairman opened the meeting at 4:05 pm. <br />Bathroom project— Brian Kelley updated the committee about the construction. The snow has slowed <br />the project, but the plumbing is done and the floor poured. The next step will be the walls. Brian has <br />put up a sign asking for donations but has had no response to date. He is still comfortable with his <br />budget and is waiting for a donation from Little league. There was discussion about the planting plans. <br />Parterre will review them. Brian presented the committee with a balance sheet. <br />Maintenance and planting plans — Vanessa introduced Myles Connors who will replace her as the direct <br />manager at Lincoln. He is a graduate of Conway School and specializes in invasive species and <br />restoration. There was a discussion of eradication of garlic mustard and other invasive plants. Vanessa <br />and Myles reported that March 22 was the date selected for pruning by employees of Parterre. There <br />will be approximately 25 employees for a period of about three hours and will be at no cost to the <br />committee. There was discussion of the disposal of the material from the pruning. Myles presented the <br />2013 calendar and budget. He said that he will need wood chips and told the group that the <br />rhododendrons are budded and look good. He explained that he felt that 2013 maintenance could be <br />done by three men for eight hours every other week. The manager would be there for about two hours. <br />Wesley will introduce Myles to Chris Filadoro to discuss planting of some available spruce trees. There <br />was discussion about additional group plantings, Wesley will look at some planting to be done this <br />spring. <br />Granite Forest —The committee looked at the design plans for the "Granite Forest" installation. <br />Everyone was pleased with the final design. Wesley had received an estimate from Fred Anderson <br />for $72,000. He is also expecting a bid from Mark McCullough. The committee agreed that this first bid <br />seems much too high. We will need to raise funds to complete this public art project. <br />Maps - Wesley showed the committee a copy of the map sign proposed for three locations — bike path <br />at Worthen Road, boardwalk at Worthen and Lincoln Street entry. The response was very positive with <br />only a couple of suggestions. As soon as the final is approved, the map signs will be made and installed. <br />The next meeting was scheduled for April 18, 2013, at 4:30 pm. <br />The meeting was adjourned at 5.40 pm. <br />Respectfully submitted,, <br />Lynne Wilson <br />