Laserfiche WebLink
<br />LDAC <br /> <br />EXINGTONESIGNDVISORYOMMITTEE <br /> <br />Meeting Minutes: <br /> <br />October 3, 2006 <br /> <br />Present: <br />Colin Smith (Chair), John Frey, Ginna Johnson, Timothy Lee, Parker Hirtle, Alenka Slezak, Betsy <br />Whitman, Bruce Creager <br /> <br />Scribe: <br /> <br />Colin Smith <br /> <br />Call to Order: <br /> <br />The Meeting was called to Order at 7:30PM. <br /> <br />Approvals: <br />th <br />Minutes of the September 5 meeting were approved with minor corrections. <br /> <br />Presentations/Review: <br />201 Bedford Street (Department of Public Works) <br />HKT Architects presented the DAC with an in-depth review of the <br />initial design process and state of the current design for this <br />functional requirements have been understood and their applicati <br />general, the DAC understands the approach to site design and building location and is supportive of the proposed <br />elements and their locations. Comments to the Site and Building <br /> <br /> Site Design: <br />1. Reduce parking spaces by four to add tree planting in front of b <br />area of lost green space. Consider same reduction in spaces fro <br />neighborÓs views of lot, provide shade for cars and absorb storm <br />2. Relocate the fence adjacent to the bikepath with room for planti <br />3. Consider adding a demonstrative, educational aspect to ÐgreenÑ a <br />and recycling runoff and ÐgreyÑ water for vehicle washing and other utilitarian uses. <br /> <br /> Building Design: <br />4. Study elevation of level one finished floor height to minimize h <br />5. Create a façade treatment that is civic in character; simple, sustainable materials, rhythm derived from <br />structure/function and substantial or generous in effect to refl <br />This would elevate the architecture of municipal pride and function as the historic continuity in place of <br />applying a ÐcolonialÑ faŒade on a modern day facility. The func <br />while being sensitive to its context in historical Lexington. <br />6. Open interior by ÐborrowingÑ views through the building. <br />7.Consider a trellis of wood and steel cable, integrated with arch <br />create an outdoor room and a place for plant material to grow. <br />transition between landscape and building. <br />8. The articulation and scale of the administration building feels <br />consider a language and scale of spaces that is consistent betwe <br />9. The entry sequence feels tight for such a large civic building. <br />lobby, one where the circulation sequence is clear (currently one enters the front door and is faced with a <br />decision about going upstairs or to the lobby). ShouldnÓt the v <br />combined for clarity of purpose? <br /> <br /> <br />314 Bedford Street (T-Mobile wireless installation) <br /> <br />