Laserfiche WebLink
an explanation for no percolation test being conducted. Mr. Wolk stated <br />that the neighbors already have flooding that occurs and when fill is added <br />to the area it will make flooding worse. Mr. Kennedy asked for an <br />explanation of the soil logs. <br /> <br />Jim Anderson of 17 Tucker Ave commented that it is illogical to add fill <br />because it will not improve the area. <br /> <br />Susan Adams of 33 Banks Ave described the pipe that runs along the side <br />of the LexHab House near a stream. <br /> <br />Gary Markowitz of 37 Baker Ave presented photographs of where the soil <br />samples were taken as well as minutes on the LexHab House from the <br />Conservation Commission meeting in 1992. <br /> <br />Mary Briggs of 32 Ames Ave stated that she appreciated the attention the <br />Commission has given to the neighbors and she feels the flooding would <br />be worse after the completion of this project. <br /> <br />John Holland of 32 Ames Ave asked the Commission their thoughts on <br />whether the flooding in the area would be worse as a result of this project. <br /> <br />Mr. Hamilton commented that the Conservation Commission only has <br />jurisdiction on this project and not runoff from the abutters. Mr. Bitsko <br />stated that filling can legally occur because the property is not in the 100 <br />year flood plain and he explained soil profiles. <br /> <br />Motion made and seconded to close the hearing, 7-0 in favor. <br /> <br />9:05 pm Cont. Hearing - NOI, Route 2 MassDOT <br /> DEP# 201-879, BL 837 <br /> Routine maintenance and repair of existing drainage structures and <br />roadway embankment at select locations along Route 2 and associated on- <br />ramps and off-ramps within the Bordering Vegetated Wetland, Land <br />Under Waterbodies and Waterways, Bordering Land Subject to Flooding, <br />and Riverfront Area <br /> Documentation: NOI Application & Supplemental Information 12/11/12 <br /> Present for the Applicant: Sean Hale, Epsilon Associates, Inc. and <br /> Andrea Norton, MassDOT <br /> <br /> Comments from the Commission as follows: <br /> Ms. Miller read that the applicant provided information on a sequencing <br />plan, working downstream to upstream, verification of pipes, an <br />environmental monitor, stabilization measures, and timing of work. <br /> <br /> Motion made and seconded to close the hearing, 7-0 in favor. <br /> <br />