Laserfiche WebLink
Minutes of the Lexington Capital Expenditures Committee (CEC) Meeting <br />January 29, 2013 <br />Date, Place, and Location: January 29, 2013, 8:00 A.M., Town Office Building, Reed <br />Room (111) <br />Members Present: Charles Lamb, Chair; Beth Masterman, Vice - Chair; Jill Hai; Bill Hurley; <br />David Kanter <br />Other Attendees: Keith Ohmart, Chair, Greenways Corridor Committee (GCC); <br />Melisa Tintocalis, Economic Development Director; Sara Arnold, Recording Secretary <br />Documents Presented: <br />• Community Preservation Committee (CPC) Project Application: ACROSS Lexington <br />Pedestrian /Bicycle Route System; GCC <br />• GCC Report to the Board of Selectmen, West Lexington Greenway Master Plan, <br />December 2012 <br />• Board showing West Lexington Greenway; GCC <br />• Mr. Kanter's e-mail to the other Committee Members; January 24, 2013; <br />Subj: Updated List of Projects for FY2014 Support from the Community Preservation <br />Fund (CPF) & CPF Status <br />• FY2014— FY2018 Capital Improvement Projects (CIPs), Department of Public Works; <br />Sidewalk Improvements & Hartwell Avenue Infrastructure Improvements <br />• Photos of Hartwell Avenue Proposed Sidewalk Areas; Economic Development <br />• Draft CEC Meeting Minutes for May 29, 2012 Executive Session <br />• Draft CEC Meeting Minutes for January 22, 2013, Open Session <br />• Draft CEC Meeting Minutes for January 22, 2013, Executive Session <br />• Draft 2013 Annual Town Warrant Table of Contents, January 16, 2013 <br />Call to Order: Mr. Lamb called the meeting to order at 8:01 A.M. <br />GCC: Mr. Ohmart reviewed two projects being pursued by this committee. <br />• ACROSS Lexington Pedestrian /Bikeway Route System: Mr. Ohmart explained that <br />the FY2014 $5,000 request is for the purchase and installation of sign posts, street <br />markings and marketing materials for the Route System. The CPC supports this <br />project and had considered, but chose not to consolidate the projected 3 -year costs <br />(FY2014— FY2016) into a single request. <br />• West Lexington Greenway: Mr. Ohmart explained that the Town's previous allocation <br />of $125,000 was used to prepare the 25% design work for this project. The resulting <br />Master Plan identifies a project that includes an all- weather path extending from <br />Minuteman Bikeway to Wood Street. Construction of the path's middle section, if <br />pursued as designed, would impact wetlands with vegetation removal and bringing in <br />fill. This is of concern to the Lexington Conservation Commission. Also, access for <br />NSTAR personnel and equipment needs to be maintained. These complications <br />resulted in a scaling back of the project. Raised boardwalks may be recommended; <br />it is unlikely that a paved walkway will be pursued in that section. <br />Page 1 of 5 <br />