|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-02-07 CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2012
>
2012-02-07 CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:15:56 PM
Creation date
1/4/2013 3:20:42 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Minutes – Lexington Conservation Commission February 7, 2012 <br /> <br />Commissioners present: Joyce Miller, Charlie Wyman, Phil Hamilton, Richard Wolk, <br />Duke Bitsko, Stew Kennedy <br /> <br />Commissioners absent: David Langseth <br /> <br />Others present: Karen Mullins, Conservation Administrator, Emily Schadler, <br />Conservation Stewardship Coordinator, and Louise Vinci, Conservation Clerk (8:15) <br /> <br />8:18 pm Hearing – 2 Forbes Road, Wellford Corporation <br />DEP# 201-845, BL 803, Construct concrete pad for placement of liquid <br />nitrogen tank <br />Brian Waterman was present for the applicant. <br />Documentation: NOI Application and Site Plan 1/4/2012 <br /> <br />Mr. Waterman explained that the proposed project is to construct a <br />concrete pad for placement of liquid nitrogen tank because the old tank <br />has a safety issue and the new tank needs to be running before the old one <br />can come down. The proposed pad is 75 feet from the adjacent wetland, <br />there is no new impervious surface, and erosion control measures will be <br />taken. <br /> <br />The Commission asked that the bituminous concrete waste be removed <br />from the site. <br /> <br />Motion made and seconded to close the hearing, 6-0 in favor. <br /> <br />8:24 pm Continued Hearing - 8 Cutler Farm Road <br />DEP# 201-844, BL 802, Raze and Rebuild Single Family Dwelling <br />Matt Hammer was present for the applicant. <br />Documentation: NOI Application and Filing Plan 2/1/2012 <br /> <br />Mr. Hammer reported that revised calculations and additional details <br />regarding the infiltration system were provided, based on comments from <br />the Commission in the previous hearing. He offered to do a confirmatory <br />evaluation of the drainage system at the time of installation. <br /> <br />Motion made and seconded to close the hearing, 6-0 in favor. <br /> <br />8:30 pm Hearing – 14 Whittier Road, S. Zhu <br />DEP# 201-847, BL 805, Construct addition <br />Zoltan Juhasz was present for the applicant <br />Documentation: NOI Application 1/18/2012 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.