Laserfiche WebLink
<br /> October 10, 2007 <br />Minutes <br />Town of Lexington Appropriation Committee <br />October 10, 2007 <br /> <br />Place and time: Cary Memorial Building, Robbins Room, 6:30 p.m. <br /> <br />Members present: Alan Levine (Chair), Rod Cole (Vice-Chair), John Bartenstein <br />(Secretary), Deborah Brown, Richard Eurich, Pamela Hoffman, Susan McLeish, Eric <br />Michelson, Mike Kennealy, Rob Addelson (ex officio, non-voting). <br /> <br />Also present: Susan Yanofsky <br /> <br /> <br />The meeting was called to order at 6:38 p.m. with a quorum present. <br /> <br />Discussion of Town Warrant Item 4 – Proposed TIF with Shire <br /> 1. . Rob <br />Addelson started the discussion by indicating that a concern had arisen with respect to the <br />lot lines in the parcel and it was concluded that it would be prudent to postpone the <br />Article to give the Town the necessary time to perform its due diligence regarding the <br />situation. It is not believed that this will have a material impact on the proposed TIF but <br />the Town needs to be sure. <br /> <br /> A group met this morning (representatives from the Town and from Shire) and <br />worked out a solution whereby instead of 3 parcels and a reconfiguration, Shire will <br />request the creation of one large parcel for the TIF zone. This will enable the alignment <br />of the parcels with a base value and will permit one TIF agreement instead of two <br />agreements. The thinking is that the plot will be subdivided next year. In all likelihood, <br />the TIF agreement will specify a base value from which the increment will be calculated <br />(to eliminate any potential for creating value by subdividing). With the creation of one <br />parcel, the value will be apportioned based on the assessed values. <br /> <br /> The new parcel will consist of a realigned 200 parcel, a realigned 300 parcel, and <br />a portion of the 400 and 500 parcels. In 2008, the value of the parcels will be based on a <br />value that anticipates the apportionment. Rob will rerun the numbers but the <br />fundamentals have not changed – we may see slightly different TIF percentages but the <br />total value of the proposed TIF will not change. <br /> <br /> A question was raised regarding the timing of this discussion, and Rob responded <br />that all conversations had been about creating the 400 parcel but it was only recently that <br />the Town realized that the lot lines were different. This would have created problems <br />when the agreement was taken to the State. The goal of the reconfiguration is to overlay <br />where Shire intends to locate the buildings with the lot lines. If Shire or Patriot Partners <br />ever wanted to sell a specific building, it would be a problem as the lot lines exist now. <br />The plan is to create one taxable parcel each for the potential 200 building, the existing <br />300 building, and the potential 400 building. The property will then be subdivided <br />accordingly, and the TIF will follow. It was noted that the subdivision will not occur if <br />there is no TIF. <br /> - 1 - <br /> <br />