<br />Lexington Capital Expenditures Committee (CEC) Minutes, 10/15/08, 8:30am, Town Office <br />Building, Room 111 <br />Members Present: David Kanter, Charles Lamb (Chair), Shirley Stolz <br />Others: Connie Rawson (Library Director), Rob Addelson (Assistant Town Manager & Town <br />Comptroller), Micah Niemy (Budget Officer) <br />Discussion of FY 10 capital requests. <br />Stone Building — Trustees want to move fast and the intent is for the funds to come from CPA. <br />The trustees prefer option A, which is to add an "ell" on the back of'the building and use that ell as <br />the main entrance. There is no stated purpose for the building under either option A or B. <br />Information from the HKT architects Inc. "Planning Report for the Stone Building," Volume I, <br />June 2008: <br />Currently: 3,234 gross s.1. <br />Option A: 4,308 gross s.f.; estimated construction cost $2,648,063 (That cost includes sitework <br />and a proposed drainage system as well as a design contingency of 25% and a construction <br />contingency of I 0%—escalated to a 2010 construction timeframe.) Option B: 3,528 gross s.f.; <br />$1,798,780 (same costing parameters as Option A) <br />DK: How soon will the ttees decide Which use? CR said by 10/31/08, and thinks it will be a multi- <br />purpose use. If it remains a branch library, then the status quo would be 25 hours per week. <br />The planning report for the Stone Building indicates that it will take $271K to bring the DIE to Bid <br />Documents phase. <br />The building is presently mothballed, the insurance claim is settled, but no work has been done. <br />Rob then spoke about future issuance of debt. Rob spoke with RFA (the Town's bond advisor). The <br />Town will go to market in February, but they're not sure how much. RFA says "not to worry" with <br />regard to finding a market. In the previous week Sudbury, Aaa, issued BANs "in the 2's". Lexington <br />issued $18.6m as bonds for the new DPW facility last February at 3.5 to 4.0%, and that project will <br />required issuing up to $7M more. <br />Chiel'of'Police Chris Casey and Captain Mark Corr join at 9:20am <br />LPD Space Needs study, $45k. LPD HQ has 12,500 s.f. presently and more than 50% of that would <br />he subject to major renovation. DIE would be two phase in FY 1 1 and FY12 with construction in <br />FY 1 3. It's considered eligible for CPA funding and they will be presenting it to the Community <br />Preservation Committee. <br />Discussion of Police Software. Woburn spent $500K for their system. This would not be until FY12. <br />CEC is generally supportive of this. <br />Adjourn: 10:15am <br />Approved: November 26, 2008 <br />