Laserfiche WebLink
<br />CEC, 11/27/06, TOB 111, 7:30am <br /> <br />CWL, TE, SS, RB, BH <br /> <br />Kanter, Chalpin, Addelson, Hadley, Wayne Brooks, Dave Cannon, Steve <br />Kropper, Dennis Wayne, Dave Pinncineau <br /> <br />Motion: Approve all previous minutes (4:0) <br /> <br />Discussion of STM-2 Article 2 report on DPW facility. Change to <br />"Construction Documents through bid phase". <br /> <br />DPW capital requests: <br /> <br />Lincoln Field: $400K. Methane Gas mitigation. Still waiting for DEP <br />approval. They've been doing quarterly testing. They need to put up <br />a 400' underground barrier between the sidewalk and the fence. The <br />range of options are between $300K and $400K. They have monitors in <br />the abutting houses, but no gas detected yet. $15K in sunk costs so <br />far from recreation operating budget. <br /> <br />Dam Inspections: $30K. State has mandated inspections every three <br />years. This appropriation is for anticipated repairs after the <br />inspections. $30K is based on consultants report estimate. <br /> <br />Water Dist. Improvements, FY08 $1.8M 8500 l.f. of pipe. Program <br />should be complete in FY11. Chalpin said he could go to 1.3M if <br />necessary. FY07 was $900K. $1.8M may be redued by MWRA grants. In <br />previous years, asked for $900K and got $450K in grants. <br /> <br />DPW Equipment, $523.3K. Sweeper $130K, Toro Ground Master $65K, Small <br />Vac Truck $225,250 (15% from W&S Ent), Toro Mower w/ snow package <br />$38.3K, Toro Mower $35K. Small vac truck would be used for flushing <br />pipes between storm drains. <br /> <br />Sanitary Sewer Improvements, $1.2M. 7000 l.f. of sanitary sewer <br />infrastructure. TE: How many years out? [many, at least through 2014] <br /> <br />Pump Station Upgrades $100K (FY08). Upgrade to new OSHA requirements <br />and end of useful life replacements. e.g. Electrical boxes. <br /> <br />Hydrant Replacement $100K. 1500 hydrants in town. Replace 50/year <br />for 3 years. DK: why only 10%. Dennis: Based on anticipated <br />replacement list from LFD. <br /> <br />GIS Implementation Plan, $368K. Additional headcount (1.5 FTE) <br /> <br />