|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2006-11-20-CEC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Capital Expenditures Committee-CEC
>
Minutes
>
2000-2009
>
2006
>
2006-11-20-CEC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 12:35:01 PM
Creation date
3/5/2009 1:35:46 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
CEC - Capital Expenditures Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CEC, 11/20/06, TOB 111, 7:30am <br /> <br />CWL, TE, RB, BH, SS <br />Connie Rawson, Karin Simmons, Dave Pinncineau, Sandy Shaw, Sheila <br />Butts, Rick D'Angelis, Rob Adelson, Deborah Brown <br /> <br />Connie Rawon wrt E. Lexington Library: Wants to take a holistic <br />approach to re-vamping the E. Lex. Library. Capital requests in town <br />package are from the BFAC study. But they'd rather have someone come <br />in and study the whole building. Will look for $15K in CPA money to <br />hire a consultant to look at ADA, structure, air quality. By Cary's <br />will, the building can only be used for 7 or 8 purposes, and if not <br />used for that purpose, it reverts back to the heirs. They are <br />currently looking at mold issue. Not sure it's there, but employees <br />are complaining. May need a placeholder for mold mitigation in FY08 <br />depending on what has found. <br /> <br />Karen Simmons (Recreation) <br /> <br />Center Basketball Court, $85K. Drainage problems and cracks. Last <br />resurfaced in 1987. Requesting $'s for reconstruction, replacing <br />backboards, rims, and benches. They have a very good estimate from <br />recent reconstructions. Tax Levy. <br /> <br />Valley Tennis Courts: $130K. Replace courts and fencing. Last done <br />1981. Recreation Enterprise Fund. SS asks if they'll do anything <br />about the acorns [yes]. <br /> <br />Boman Fields: $50K. Want to rebuild ("top-dress") the baseball field, <br />backstop, and open turf. They expect a lifetime of 10 years or more <br />for the field work, and 20 years for the backstop. They've done <br />top-dressing on other fields and like the results. They believe that <br />it will last if it maintained properly. <br /> <br />Much discussion about School Admin's plans to possibly put a new <br />school on the Boman fields. Sentiment is that a new school at Boman <br />is at least 5 years away so it is better to fix the fields in the <br />meantime than to not. <br /> <br />Status of previous projects: <br /> <br />Center Playground inspection is today so should open later this week. <br /> <br />Golf course, core aerator has been ordered and should be in soon. <br /> <br />Center Pool Complex study bid docs are being put together. The study <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.