Laserfiche WebLink
<br />CEC 3/16/06, LPD Guard Room, 7:30 pm <br /> <br />TE, SS, CWL, RB, BH <br /> <br />WRT Center playground, still 5:0 in favor. <br /> <br />Lincoln Field Methane Gas Mitigation will be IP'd. <br /> <br />WRT TOB Ramp <br /> <br />TE: In favor of it with or without CPA funding. <br /> <br />SS, RB, BH all in favor of it, but only under CPA. <br /> <br />wrt putting TOB Ramp on at-risk list: 5:0 against it being on override <br />because it should just get done without it being at-risk. <br /> <br />BH: Fund it with CPA or with nothing in FY 07. <br />RB, SS, TE: Agree. <br /> <br />wrt LFD Floor ($50K). No new estimate for this. <br /> <br />wrt 32(a) Capital Plan for Elem. Schools. SS in favor, other 4 <br />against. <br /> <br />BH: we already know that it will tell us to tear down Estabrook. <br /> <br />Motion: Separate Article 32(a) and 32(i) from rest of 32. 5:0 in <br />favor. <br /> <br />TM needs to be aware that this survey would lead to telling us what we <br />already know. e.g. Estabrook needs to be torn down. <br /> <br />BH: if they need this opinion they can get it for less $'s. <br /> <br />White House Article: wait and see if SC proposes any appropriation. <br /> <br />NStar parking lot: 33 cars at $150K capital cost. <br /> <br />wrt Sr. Center Study money: Wait and see if the article comes up. <br /> <br />Motion: Approve 2-27 and 3-1 minutes. 5:0 in favor. <br /> <br />Adjourn: 8:35pm <br />