<br />CEC 1/30/06, TOB 111, noon <br /> <br />CWL, TE, SS, RB, BH <br />Bill Hartigan, Dr. Paul Ash, Tom Griffiths, Olga <br /> <br />Presentation of revised 5 year school capital plan. Several items for <br />elementary schools were removed because < $25K. <br /> <br />Strategic planning in elementary schools at $40K for 4 old <br />elem. schools due to redistricting. This is to look at the program <br />space in the remaining elementary schools post-redistricting and to <br />revise the existing program documents for rebuilding/renovating those <br />four schools. This is a statement by the School Committee that we <br />will still have to do something about the remaining four elementary <br />schools, whether rebuild or renovate. <br /> <br />Ash: Wants to make sure buildings are right size for enrollment <br />projections and redistricting. Redistricting schedule: report to SC <br />in 10/06, vote new district lines 12/06, implement 9/07. This is for <br />K-8. This $40K appropriation puts them in a position to go forward <br />with D&E in (say) FY08. <br /> <br />Gym and Science building roofs: waiting for bids. $493K is <br />consultant's estimate. Ditto Diamond aud. roof at $60K. <br /> <br />BH: Is this entire science bldg roof? Olga: part was done during <br />construction project. This may or may not be the entire roof <br />depending on what can be saved. <br /> <br />LHS Univents @ $493K: 187 univents are in poor condition. Replace <br />these and steam piping. Spend money on main bldg converting main <br />boiler from steam to how water. Asked Keyspan for possible grants, <br />but no answer yet. They'll replace the vents too. No relationship to <br />auditorium work. No D&E $'s appr'd yet. This will not improve energy <br />management, but will product energy savings. Replacing 50 year old <br />univents units. <br /> <br />LHS bldg control system: Satellite LHS buildings have DDC, but main <br />bldg doesn't have one. Pneumatic system doesn't work. If you replace <br />the pipes you have to do DDC also so that $200K + $493K are hand in <br />hand. RB: points out that NStar rebates are available. <br /> <br />Diamond: $150K for control system may mean a $75K rebate. <br /> <br />DHW Heaters: 2 have patches (> 15 years old). 250-300 gal. ea. Steam <br />heated, gas fired. Will look at alternative fuel sources. <br /> <br />