Laserfiche WebLink
<br />CEC, 10/20/05, TOB 111, 8:30am <br /> <br />CWL, SS, RB, TE, BH, GB <br /> <br />DPW: Dave Cannon, Wayne Brooks, Dennis Meehan, Wayne Medlin, Bill <br />Hadley, Kelly Kelly Zeoli, Mike Flaming <br /> <br />DPW Facility is #1 priority, $12M ($10-$12M). Hadley, Brooks met w/ <br />PBC. 11 proposals shorted to 4 to be interviewed next week. Pre-bid <br />meeting was in August. Probably won't have a $ amount until just <br />before the ATM. Looking for 55K s.f.. Hadley will email RFQ to TE or <br />CWL. <br /> <br />#2: Equipment, $434K, FY07, looking at hybrids for some vehicles. <br />Toro mower at $15K is not capital. CEC requested that DPW move cars <br />(3@$28K) to operating since those have traditionally been operating <br />and not capital. <br /> <br />#3: Building Envelope, $315K. Items are based on the BFAC report. <br />Westview Cemetery, Munroe Cemetery bldg roof repairs, Park Dept Bldg <br />upgrades are $30K. ADA Ramp at TOB and curb cuts near schools at <br />$100K ($25K for curb cuts, $75K for TOB ramps). SS requested that <br />they show the breakdown between those on future reports. Visitor <br />Center replacement of electrical system at $75K. They want to upgrade <br />the entire system. TE: How necessary is this? Medlin: with computers <br />and A/C, load is high. Consultant has looked at the number and <br />validated it. RB: Possibly could put central A/C in and get some <br />NStar rebates. Fire station floor is $50K. Final results of <br />structural analysis is not completed w/ $ estimate in it. Floor is 10% <br />overstressed. Results of analysis will tell how much needs to be <br />spent on what. Fire station drainage, roof repairs, women's shower, <br />$60K from BFAC. <br /> <br />#4: $500K for streets. Roads are currently in 3rd year (just <br />finishing third year). Going well, expect completion in fall 06 <br />unless unexpected wx occurs. <br /> <br />#5: $150K sidewalks. Wayne Brooks is Sidewalk Committee liason. <br />Mostly rennovations, but may try to put in some new sidewalks too. RB <br />asked about tree roots. Brooks said this is the biggest problem. <br />Sometimes they cut the roots, sometimes they go back and raise the <br />sidewalk gradually. Center sidewalks are not on this appropriation -- <br />SWC and WB don't want to touch that since that seems to be more of a <br />project for BoS. SWC will give blessing to the list that Wayne comes <br />up with. <br /> <br /> <br />