Laserfiche WebLink
<br />Meeting Date 10/24/01 <br />The corrections were for the spellings of the names of some individuals. The minutes were <br />approved unanimously at the CEC meeting held on 10/31/01. <br />Narain Bhatia <br />------------------------------------------------- <br />Call to order 7.40 pm. Present: All members of cec and Bill Hadley, Peter Chalpin, Brian Gilbert <br />and David Carboneau from DPW <br /> <br />Minutes of the 9/19/01 CEC meeting were approved unanimously. <br /> <br />Building Envelope: <br /> Bill Hadley updated current building envelope projects, all of them on track <br />and on budget. A new item of 28K for barn structural changes was added mandated by some <br />safety inspection. The 600k per year is based on industry standard of 5% of the value of the <br />buildings -- DPW has no specific projects in mind after 03. DPW was told to include inflation <br />escalator in the projections. <br /> <br />DPW Equipment: <br /> Bryan reported that the projection were higher than last year because they <br />had taken a closer look. They follow a procedure to review usage, age and condition of each <br />equipment in coming up with the recommended schedule. DPW was asked to see if it was <br />possible to develop some evaluation criteria like comparing to similar towns, unit service costs, <br />outsourcing etc. PeterC said town comparison was not practical because no other town, <br />according to him, does what they do. <br /> <br />GIS System: <br /> This 95K item was dropped by DPW and may show up as a request from A & F <br />(John Ryan) since it seems to be more connected with computers and MIS. <br /> <br />New Reporting Format: <br />DavidCpresented new format of reporting their capital projects in three <br />categories. <br /> <br />1. Public facilities and Equipment: It includes Building Envelope, DPW Equipment, DPW <br /> <br />Operations Bldg. and Landfill Closure <br />2. Highways and Drains: It includes Street Improvements, Storm Sewer Improvements, <br />Traffic Improvements and Sidewalk Improvements. <br />3. Water & Sewer: It includes Water Distribution Improvements and Sanitary Sewer <br />Improvements <br /> <br />DPW Building: <br /> BillH reported that a new working group has been formed to study different land <br />uses of the existing and (I believe) the land closure site on Hartwell Ave -- target report date end <br />Nov. CDM was consulted on feasibility of combining senior center and new DPW bldg.at 201 <br />Bedford -- it is feasible considering all issues like safety, parking and operations. The projections <br />10.3 million for 04 and 05 are for the existing site, Hartwell site will cost more. <br /> <br />Land Closure: <br /> DavidC said they are winning the war and hope to complete the state <br />requirements under "hazardous waste" rather than "solid waste" regulations. He noted that <br />Lexington is first in this program. Tests so far suggest cost of $1.28 million shall be adequate vs <br />potential cost of $3.2 million under old regulations. Much depends on the land use of the area <br />and hence tied with DPW building and COA decisions. DPW was told about the need to combine <br />override items in 05. <br /> <br />Roads: <br /> No change in programs, the 07 amount will go down. We will still need $7 million override <br />for four years in addition to $1.1 million (450K from small ticket capital program and 650K from <br />chapter 90). <br /> <br />Storm Sewer Improvements: <br />DavidC sited two major problem areas - Winter St and Lake St - <br />and about 15 field complaints that go up in bad rains. They are looking for 125K in 03 for mostly <br />"design" money that includes 25K to get an Umbrella Drainage Maintenance Permit from state so <br /> <br />