|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2008-09-17-REC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Recreation Committee-REC
>
Minutes
>
2000-2009
>
2008
>
2008-09-17-REC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:28:09 PM
Creation date
2/24/2009 1:08:45 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - REC - Recreation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Town of Lexington <br />Recreation Committee <br /> <br /> <br /> <br /> <br />Frederick DeAngelis, Chairman Tel: (781) 862-0500 x262 <br />Richard Thuma, Vice Chairman Fax: (781) 861-2747 <br />Wendy Rudner <br />Sandra Shaw <br /> <br />RECREATION COMMITTEE MEETING <br />September 17, 2008 <br /> <br />Members Present: Wendy Rudner, Rick DeAngelis, Dick Thuma and Sandra Shaw <br /> <br />Staff Present: Karen Simmons, Dave Pinsonneault <br /> <br /> <br />AGENDA <br /> <br />1. Citizens and Other Boards <br />Tony Porter, Lexington High School Athletic Director attended the meeting to receive a copy <br />of the Recreation 5-Year Capital Plan. <br /> <br />2. Meeting Minutes <br />Amend the August 20, 2008 meeting minutes with the following: Page 3- Add “managing <br />design services”. Page 4, “hat” should be “that”. <br />Acceptance of the amended meeting minutes from August 20, 2008 was moved by Sandy <br />The minutes were accepted by a vote of 4 – 0. <br />Shaw and seconded by Wendy Rudner. <br /> <br />3. Five Year Capital Plan <br />Karen Simmons handed out the Recreation 5-Year Capital Plan. The recommendation to <br />add an ADA study was added to FY2014. In addition, updated information was received <br />from the engineer on the Old Reservoir/Marrett Road Storm Water Mitigation Project and it <br />is recommended to break the project into 2 phases. Phase I will be in FY10 and Phase II will <br />be in FY2011. The estimated cost of the project is much higher than originally estimated. <br />The funding for this project is being requested through the Community Preservation Act, as <br />preservation of a recreation resource area. Karen Simmons also told the Committee that Dr. <br />Bernward Hay of the Louis Berger Group, Inc., who conducted the Water Quality Study, <br />believes that the Town will be eligible for a Department of Environmental Protection (DEP) <br />grant through the state. If granted, the state would pay for 60% of the cost of the project. <br />Grant applications are due by June 2009. <br /> <br />The Recreation Committee had a lengthy discussion on the Park Improvements- Athletic <br />Field Improvement Project. Members of the Recreation Committee voiced their concern <br />about the carnival and can only support the athletic field renovation project if the carnival <br />moves to a different location. Karen Simmons recommended that a member of the <br />Recreation Committee reach out to all of the stakeholders to begin the dialog. Karen <br />1625 MASSACHUSETTS AVENUE • LEXINGTON, MASSACHUSETTS 02420 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.