5. Recreation Report <br />A. Karen Simmons presented a report on the status of Recreation Capital Projects: <br />??The tennis backboard should be installed within the next two weeks. Forte <br />Construction has been retained to install the boards. The Recreation Department has <br />incorporated Richard Petrasso’s feedback and suggestions into the planned location of <br />the three practice boards. Dave Pinsonneault discussed the placement of the boards <br />and proposed signage with the Recreation Committee. <br />??The Pine Meadows Golf Club engineering study is ongoing. Tutela Engineering was <br />hired in Fall 2006. They are expected to deliver a draft report to the Recreation <br />Department in Fall 2007. <br />??Karen Simmons reported that the Town interviewed four companies that responded to <br />the Pool Audit (#27b of 2006) Capital project. It is anticipated that the company <br />hired will work through the summer and present a draft report in early fall. <br />??The Center Playground Capital project is complete with the exception of the purchase <br />and installation of a few site amenities such as additional benches and picnic tables. <br />Dick Thuma asked if the Recreation Department and Recreation Committee <br />o <br />would be able to incorporate the findings of both the Pine Meadows Hydrology <br />Study and the Pool Audit into FY2009 Capital requests. Karen Simmons noted <br />that the Department reviews the five-year capital plan annually and makes <br />modifications as needed and recommended by the Recreation Committee. <br />??The FY08 Capital Projects are: Center Basketball Court reconstruction, Valley <br />Tennis Courts reconstruction, and renovation of the fields at the Bowman School. <br />Dave Pinsonneault will seek information and direction from the School Department <br />regarding a possible upcoming school renovation of the Bowman School. Karen <br />Simmons reported that the Town is currently negotiating the cost of architectural <br />services with Geller Sport for the Valley tennis courts and Center basketball courts. <br />Hopefully work will begin at Valley in late August and at the Center in September. <br />??Skate Park Fencing – Dave Pinsonneault will obtain a quote from City Works, which <br />is on the state contract, for installation of a six-foot fence around the skate park. <br />Lincoln Park – $12,500 remains in the Lincoln Park Article. There is a problem with <br />?? <br />erosion on the walking path near the Softball field. This money will be spent to <br />address and remedy that problem. Some members of Town Meeting continue to <br />insist that restrooms were a part of the project. However, Karen Simmons stated that <br />at no time was the restroom facility a part of the initial project. Rather, Town <br /> <br />Meeting was informed that if there were leftover money the Town would use it for <br />restrooms. <br /> <br />B. Karen Simmons gave the Recreation Committee an update on the situation with Ice <br />Cream Vendors for summer 2007. She explained that she is working with Town Counsel <br />and the Town Manager’s Office to resolve the issue. <br />C. Sandra Shaw raised the issue of parking on the grass along Lincoln Street near the Little <br />League Field. She noted that parents of Little League players and other spectators are <br />pulling up over the curb and onto the grass rather than using the parking lot at Lincoln. <br />Dave Pinsonneault indicated that he is going to contact Little League about this issue. <br />D. Harrington Playfield – Karen Simmons provided the Recreation Committee with an <br />update on the status of the playing field at Harrington School. The field was not built to <br />athletic field specifications, and remains unplayable. Dave Pinsonneault and Karen <br />Simmons reported that the Recreation Department had not been charged for the <br />installation of irrigation at the Harrington Fields. As a result of discussions with the <br />2 <br /> <br />