|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2000-10-18-REC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Recreation Committee-REC
>
Minutes
>
2000-2009
>
2000
>
2000-10-18-REC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:26:16 PM
Creation date
2/24/2009 11:43:19 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - REC - Recreation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Town of Lexington <br />Recreation Committee <br /> <br /> <br /> <br /> <br />Sandra Shaw, Chairman Tel: (781) 862-0500 x262 <br />Pamela Varrin, Vice Chairman Fax: (781) 863-2350 <br />Frederick DeAngelis <br />Donald A. Chisholm <br />Richard L. Neumeier <br /> <br /> <br /> <br />RECREATION COMMITTEE MEETING <br /> <br />October 18, 2000 <br /> <br /> <br />Members Present: Sandra Shaw, Pam Varrin, Don Chisholm, Rick DeAngelis, <br /> Dick Neumeier <br /> <br />Staff Present: Brian Gilbert, David Pinsonneault, Matt Casparius <br /> <br /> <br />AGENDA: <br /> <br />1. David Pinsonneault, new Superintendent of Public Grounds, was introduced to the members <br />of the Recreation Committee and welcomed to the Town. <br /> <br />2. The minutes from September 20, 2000 were approved. <br /> <br />3. Capital Budget 5-year <br />Karen Simmons had to turn in the 5-year Capital Budget last week. Some changes have been <br />made, so we need to go over it. We’ve got some big developments on the Pine Meadows <br />project. The entire project is going to cost over $530,000 for the maintenance building, parking <br />lot and road. With such a high cost, we cannot afford to do the entire project in one year, so <br />Karen is recommending in the budget that the project be phased in over two years. <br /> Phase I: would be to complete the road. <br /> Phase II: would include the maintenance building and the parking lot. <br /> <br />Don led a discussion with the committee questioning whether or not this was a necessary <br />investment. The committee feels that the overall cost is a bit expensive, and would like to look at <br />it again at the next meeting. The feeling is that the members need to be able to rationalize the <br />expense themselves before they can defend it at Town Meeting. It was suggested that Dick <br />Lakutis come to the next meeting, if possible, to outline the details of the project and what the <br />various components would be when broken down. <br /> <br />Retaining wall - The engineers are still conducting their study on the retaining wall. Karen does <br />not have a recommendation for the committee yet. However, she had to include it in the 5-year <br />capital plan, so she has put a placeholder in for FY05. Depending on how the report comes back <br />1625 MASSACHUSETTS AVENUE • LEXINGTON, MASSACHUSETTS 02420 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.