|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2007-12-BOS-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Select Board-SB (formerly Selectmen, Board of-BOS)
>
Minutes
>
2000-2009
>
2007
>
2007-12-BOS-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 12:59:53 PM
Creation date
2/5/2009 1:08:39 PM
Metadata
Fields
Template:
Archives
Department
Selectmen
Keywords or Subject
BOS - Board of Selectmen
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Selectmen’s Meeting <br />December 3, 2007 <br /> <br />A special meeting of the Board of Selectmen was held on Monday, December 3, 2006, at 8:00 <br />a.m. in the Selectmen’s Meeting Room for Department Budget Presentations. Chairman Krieger, <br />Mr. Kelley, Mr. Cohen, Mr. Manz and Mr. Burnell; Mr. Valente, Town Manager; and Ms. Pease, <br />Executive Clerk, were present. <br /> <br />FY 2009 Budget Presentations <br /> <br /> Library <br />Ms. Rawson presented the Library FY2009 Budget Requests. Level Service Requests: General <br />and Technical Services $402,955; Adult Library $1,073,400; and Children’s Library $345,300. <br />Total Level Service Budget: $1,821.655. The decrease of 12.79% from FY2008 is due to <br />transferring out $219,800 in utility costs to the Department of Public Facilities and to significant <br />turnover in staff resulting in the hiring of new staff at lower salaries. <br /> <br />Program Restoration Request: Postage - $4,600 <br /> <br />Program Improvement Requests: Library Materials Request - $25,000; Library Program <br />Coordinator - $16,403; Enhanced Audiovisual and Broadcasting Service - $14,200 <br /> <br />Capital Improvement Project: Renovation of East Lexington Branch Library - $ unknown in <br />FY2009. <br /> <br />Department Goals include: <br />1. East Lexington Branch Library – continue to develop a comprehensive plan to <br />address physical conditions and Trustees must decide on the future use. <br />2. Utility Usage – work with Facilities Department to identify ways to improve energy <br />management. <br />3. Collection Development – restore library collection to pre-construction conditions; <br />meet the 13% materials requirement required by the Massachusetts Board of Library <br />and improve Lexington’s Net Borrower Status within the Minuteman Library <br />Network <br /> <br />Recreation <br />Ms. Simmons presented the Recreation FY2009 Budget Requests. Level Service Requests: <br />Recreation $1,059,621; Pine Meadows $512,174; and Indirect Costs $275,399. Total Level <br />Service Budget $1,847,194. The total increase of 3.57% reflects an increase in seasonal wages <br />due to the increase in the State minimum wage and the transfer to this budget for employee <br />benefits. There were reductions in contractual services, a reallocation of seasonal wages for in- <br />house summer youth programs, professional services for a one-time FY2008 water quality study <br />of the Old Reservoir and electricity based on the average usage over a 3-year period. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.