Laserfiche WebLink
MINUTES —LEXINGTON CONSERVATION COMMMISSION July 24, 2007 <br /> Commissioners present: Joyce Miller, Duke Bitsko, Stew Kennedy, Dick Wolk, Angela Frick <br /> Absent: Phil Hamilton, David Langseth <br /> Others present: Karen Mullins, Administrator, and Adam Bossi, Administrator Assistant <br /> Joyce Miller, Chair, opened the meeting at 7:33p.m. in room G -15, Town Office Building. <br /> 7:33 p.m. Hearin: 26 Ingleside Road, <br /> Present for owner /applicant: Brian Timm, Meridian Associates <br /> Scott Smyers, Oxbow Associates <br /> Stephen and Sabina Caron, owners /applicants <br /> Mr. Timm presented a plan, which included the construction of three minor <br /> additions, the removal of some of the existing driveway to mitigate for the <br /> increase in impervious area, and the addition of pervious patio treated as <br /> impervious for drainage calculations. <br /> Comments for the commission followed: Angela Frick wanted to know if the <br /> patio would be made of pervious material. Ms. Frick was concerned about the <br /> wetland impacts from this project in conjunction with the work being done at 24 <br /> Ingleside Road w and wanted a condition added that the patio be made more <br /> pervious. Joyce Miller was concerned about the bed of woodchips /mulch <br /> currently in the 25 -foot wetland buffer zone, and she feels they will end up in the <br /> wetland and would like to have them removed and the buffer zone be allowed to <br /> naturalize. Ms. Miller wanted a planting plan submitted. She also wanted <br /> clarification on the type of foundation that would be used for addition section A. <br /> Duke Bitsko asked if the commission was approving wetland lines as apart of <br /> decision. Ms. Miller answered that the commission was not approving the wetland <br /> boundary and only checked the delineation closest to the project limits. Mr. <br /> Bitsko also asked if the basketball hoop would be removed. Stew wanted to know <br /> how roof runoff was presently controlled. <br /> In response to Ms. Frick, Brian Timm said the patio would be made of paver <br /> stones set in stone dust, but can you use sand if the Commission wishes. In <br /> response to Ms. Miller in regards to foundation type, Mr. Timm said regardless of <br /> foundation type the disturbance to the area would be the same. In response to Mr. <br /> Bitsko, Mr. Timm replied that the basketball hoop would be removed. In response <br /> to Mr. Kennedy, Mr. Timm said roof runoff was controlled using one down spout <br /> that channeled runoff onto the driveway. <br /> Motion made and seconded to close the hearing, 5 -0 in favor. <br /> 7:48 p.m. Hearin: 39 Le&�elawn Avenue, <br /> Page 1 of 4 <br />