Laserfiche WebLink
MINUTES —LEXINGTON CONSERVATION COMMMISSION June 26, 2007 <br /> Commissioners present: Joyce Miller, Dave Langseth, Duke Bitsko, Stew Kennedy, Dick Wolk, <br /> Angela Frick <br /> Absent: Phil Hamilton <br /> Others present: Karen Mullins, Administrator, Adam Bossi, Assistant Administrator, and Louise <br /> Vinci, Department Clerk <br /> Joyce Miller, Chair, opened the meeting at 7:35p.m. in room G -15, Town Office Building. <br /> 7:35 p.m. Meeting: RDA, Pleasant Street, <br /> Present for the applicant /owners: Brett Mason, Oxbow Associates <br /> Mr. Mason presented a plan to reinstall about 1,000 ft. of 4 -inch gas conduit along <br /> the southern side of Pleasant Street. David Langseth had concerns that sediment <br /> could erode into catch basins. Mr. Mason responded by stating that no soil would <br /> be stock piled overnight. Administrator Mullins suggested erosion controls in <br /> catch basins near area of work, and demarcation of staging areas during pre - <br /> construction meeting. <br /> Motion made and seconded for negative determination with standard conditions <br /> and conditions as identified during the meeting, 6 -0 in favor. <br /> 7:45 p.m. Meeting: RDA, Grandview Avenue, <br /> Present for the applicant /owner: Mary Trudeau, Wetland Consultant, <br /> David Remero, Commonwealth Engineering, <br /> David Burns, applicant /owner <br /> Ms. Trudeau presented a plan for the construction of three single- family dwellings <br /> and connection of the drainage to municipal storm water drainage system. <br /> Comments from commissioners: David Langseth asked if the new street catch <br /> basins would drain into infiltrator system. When Ms. Trudeau said that they did, <br /> Mr. Langseth commented that the plan needed details with elevations showing <br /> how the overflow from the new infiltrator system connected to the existing <br /> municipal system. Condition to include in permit: revise and submit plan with <br /> details of overflow connections. Duke Bitsko asked if all the infiltrator systems <br /> would have inspection and maintenance ports. Conditions to include in permit: 1. <br /> Provide at least two inspection ports with risers and covers to grade in each <br /> system and 2. Maintain annual inspection and maintenance logs and submit <br /> evidence of maintenance to the Conservation Office on an annual basis. Stew <br /> Kennedy asked about grading to prevent runoff from impervious surfaces flowing <br /> to adjacent properties. David Burns responded by stating that the special permit, <br /> Page 1 of 5 <br />