Laserfiche WebLink
Lexington Sidewalk Committee Meeting Minutes <br />Monday, November 7, 2011, 9 AM <br />Ellen Stone Room, Cary Hall <br />Present: Judy Crocker, John Davies, Lucy Fletcher- Jones, Bettina McGimsey, Francine <br />Stieglitz, Jerry Van Hook (Chair); Liaisons: Wendy Manz (Planning Board), Hank Manz <br />(Board of Selectmen), Marc Valenti (DPW) <br />The meeting of the Sidewalk Committee (SWC) was called to order at 9:05 AM. <br />1. The minutes of the October SWC meeting were approved as amended. <br />2. Proposals for new sidewalks in town: The SWC has heard from a variety of communities <br />in town regarding the need for new sidewalks. Specifically, we are waiting to hear from <br />residents of various streets in town Winthrop Road, Hill Street, and Pleasant Street to <br />determine where their communites are in the process of petitioning for a sidewalk. <br />In a general discussion of the petition process, Jerry Van Hook raised the issue that <br />premature discussions of sidewalk placement may forestall the petition process. First and <br />foremost, abutters of a street need to agree that a sidewalk is necessary. Where the <br />sidewalk will go ideally would be determined by Town Engineering and said determination <br />would be based on objective factors, including easements, physical atrributes of the space, <br />etc. Hank Manz noted that, while sidewalk placement should be a dispassionate decision <br />based on such objective factors, this is not always the case. <br />3. Safe Routes to School update: Judy Crocker thanked Mark Valenti and his crew for a good <br />job cleaning the debris from the October snow storm. Hank Manz noted that the Board of <br />Selectmen will discuss what to do with debris at their meeting on 11/7/2011. Due to the <br />storm, November's Turkey Trot was postponed until November 9. <br />Ms. Crocker noted that she is working with the Facilities department on a proposal for bike <br />racks. This will be submitted this month and ideally the areas where the bike racks would <br />be installed would be prepared before the winter, as the bike racks will arrive in March. <br />Ms. Crocker reported on the Estabrook Task Force. Access to Estabrook during <br />construction will be at the Grove Street entrance. No construction vehicles will be allowed <br />during arrival or dismissal times. There is still a question as to whether free busing will be <br />provided to students at the school during the construction phase. Mark Valenti noted that <br />his crew is installing the fluorescent green pedestrian signs at the crosswalk by the school <br />on Grove Street. <br />