Laserfiche WebLink
Lexington Sidewalk Committee Meeting Minutes <br />Monday October 3, 2011 at gam <br />Present: Jerry Van Hook (Chair), Judy Crocker, John Davies, Lucy Fletcher- Jones, <br />Hank Manz, Bettina Mcgimsey, Francine Stieglitz <br />Liaisons: Elaine Celi (LPS Transportation), Marc Valenti (DPW) <br />Guests: Jill Hai <br />1. The September meeting minutes were approved. <br />2. Proposals for New Town Sidewalks <br />a) Jill Hai from Winthrop Rd presented an updated community petition with over 70 <br />signatures for the installation of new sidewalks along Winthrop Rd and a missing <br />sidewalk gap at Winthrop /Highland Ave. A crosswalk will also be necessary for <br />Waltham /Winthrop St intersection. Originally presented nearly one year ago, this <br />petition has additional signatures and all abutters have now been contacted from <br />this community group. According to Ms. Hai, only two abutters voiced opposition to <br />the plan. A copy of this amended petition was given to the Committee. <br />The Committee reiterated that it does not choose a side of a road for sidewalk <br />installation. Engineering determines this recommendation based on the location of <br />the right -of -way, safety issues, and the location of Vine Brook along with <br />Conservation. Engineering did conduct a walk - through of the area with Ms. Hai but <br />now needs funding to perform an Engineering Report. <br />Other pertinent connectivity points that would benefit from this new sidewalk <br />include the Farmer's Market (Mass Ave /Winthrop), LHS and its playing fields <br />(Waltham /Winthrop ST), and the Percy Rd resident facility (Highland /Mass Ave). <br />The Committee advised Ms. Hai to ask to make a presentation to the Selectmen, after <br />which Engineering can meet with the Sidewalk Committee. <br />b) Ms. Stieglitz received an email expressing concern of the sidewalk at the <br />intersection of John Benson Rd and Winter St. Mr. Valenti will investigate. <br />3. The Safe Routes To School(SRTS) update included: <br />a) SRTS will be working with Dave Pinsoneault from DPW on securing a MAPU grant <br />for bike racks. <br />b) October 11 at 9:30am will be the Ribbon Cutting Ceremony celebrating the <br />completion of the Bowman SRTS- MassDOT infrastructure grant. All are welcome! <br />c) The Estabrook Tsk Force heard a report from Beta Consultants regarding the <br />length of proposed parent vehicle queue space necessary based on Estabrook School <br />car counts. This was compared to schools in the surrounding area. <br />d) SRTS has new or re- established PTA Committees at Fiske, Estabrook, and <br />possibly Harrington and Clarke, in addition to Bowman, Bridge, and Hastings. The <br />theme will be the Year of the School Bus, where in January the program will hold a <br />