Laserfiche WebLink
Sidewalk Committee <br />April 4, 2011 <br />Present <br />Members: Jerry Van Hook, Lucy Fletcher- Jones, Judy Crocker, Jeanne Krieger; <br />Liaisons: Elaine Celi (School Administration), Richard Canale (Planning Board) <br />Staff: Marc Valenti, John Livsey <br />The meeting was called to order at 11:04 <br />The minutes of the March 7, 2011 meeting were accepted. <br />Resident Guidelines for Requesting New Sidewalk Installations <br />Judy Crocker will incorporate the edits, recommended last meeting, and circulate a Draft 3 for review and <br />comment prior to presentation to the Selectmen. <br />Update in the Master List <br />Marc Valenti circulated an updated Master List and solicited suggestions for prioritizing FY12 sidewalk repair <br />work. He recommends that the FY 12 $200,000 appropriation be used to promote continuity and take advantage of <br />ongoing projects. Accordingly, he recommends the following: <br />Sidewalk installation at the intersection of Marrett Rd. and Lincoln St. in conjunction with the Lincoln St <br />resurfacing projects and the recently completed School St. sidewalk installation. Committee members suggested <br />that sidewalks across curb cuts at commercial establishments be clearly marked. <br />Phillip Rd. sidewalk repair connecting the SRTS project ending at Lantern Lane with the Bowman School <br />Driveway. This project will complete sidewalk repairs on the full length of Phillip Rd. <br />Upgrades of handicapped ramps on Massachusetts Avenue between Woburn St and Pleasant St to insure <br />crosswalks are accessible to all users. This project would involve reevaluating and correcting the position of <br />some crosswalks. Installation of a handicapped ramp costs between $1,500 and $2,500. <br />Repair of path connecting Middleby Rd. and Worthen Rd. The scope of work is undefined, but this much used <br />path is in dire need of repair. <br />Marc will circulate a PDF of the Master list, sorted by School District, showing only the Repair projects. Input will be <br />sought from the SRTS Committee to prioritize the Repair projects < $50,000, with the understanding that just because a <br />project rates a high ranking, does not mean that it will be completed in FY12. Comments from the School Bus Survey will <br />be scanned for potential projects as well. <br />Other projects John Livsey reported on the status of major sidewalk projects <br />Concord Avenue from Waltham St. to Spring St. —The firm to conduct the feasibility study has been selected. <br />The first community meeting will be held in a couple of months. <br />Hayden Avenue - Design is underway; construction will be completed in 2 years using state funds <br />Bowman SRTS project another project funded by the State which will begin construction this summer <br />