|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-07-13-WALKS-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Sidewalk Committee-WALKS
>
Minutes
>
2005-2009
>
2009
>
2009-07-13-WALKS-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 4:12:22 PM
Creation date
9/16/2009 8:49:58 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - WALKS - Sidewalk Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Lexington Sidewalk Committee Meeting <br />th <br />Minutes of July 13, 2009, 11:00 am Selectman’s Board Room <br />Members Present <br />: Jerry Van Hook (chair), Lucy Fletcher-Jones, Margaret Lotz, <br />Suzie Barry <br />Liaisons Present <br />: Richard Canale (Planning Board), Jeanne Krieger (Board of <br />Selectman), Wayne Brooks (DPW) <br />Guests <br />: Jane Kalinski (Hastings SR2S), John Livsey (Town Engineer). <br /> <br />1. Review of May Minutes and discussion/Approval of June Minutes <br />Some small changes were made to the June minutes and both May and June minutes were <br />approved. Final approved minutes will be distributed to the Committee by the person <br />writing the minutes. Lucy Fletcher-Jones (web site) will then send to Candy McLaughlin <br />for posting to the Town web site and to archives for filing. <br /> <br />2. SWC Attendance requirements <br />Jerry wrote to the members who rarely come to meetings – Laura Cecere and Sara <br />Chamberlain. He also contacted the Board of Health liaison, Sharon McKenzie about <br />continuing with the committee and, if not, if an alternate might be named. Laura replied <br />that she could not continue as a member. He will write again to pursue a response from <br />Sarah and Sharon. <br /> <br />3. Roosevelt Road Project <br />After several meetings, and after the Selectmen had approved the project, a request was <br />received from abutters Monica Grewal and Jeff Ruberti for an engineering or any town <br />representative to explain the installation plan, as there were physical obstructions on the <br />north side to be managedThe SWC would like to advise Engineering to consider the <br />. <br />need for snow plowing and a curb when designing the sidewalk. Wayne Brooks replied <br />that DPW would survey and try to make the sidewalk 5’ wide on the townside of the <br />property line to enable snow plowing. Jeanne Krieger confirmed that the Sidewalk <br />Committee is officially no longer involved in this project and Engineering are now <br />leading it and should answer any questions and concerns from the public. Jane Kalinski <br />asked for a general procedure for installing a sidewalk. Jeanne Krieger responded that it <br />was different for every one. <br /> <br />4. Safe Mass Ave Committee and review of Engineering plans <br />Jerry reported that the Mass Ave Committee were donated barrels to hold the flags to be <br />placed on either side of 3 crosswalks on Eastern Mass Ave. TSAC were consulted and <br />expressed a neutral opinion on the idea. The committee is aiming to start using the flags <br />in September. <br /> <br />Engineering view on Mass Ave: some cyclists have expressed concern over the safety of <br />the intersections.There are no special plans for eastern Mass Ave. Richard Canale <br /> <br />reported that the Planning Board master plan study for Mass Ave has started and will take <br />2 years. Funding may come in 3 years. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.