|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2774 Report, H.P. Cummings Company to High School House Building Committee, July 22, 1902
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
HISTORIC ARCHIVES (LIMITED TEXT SEARCH)
>
Old Town Papers (individual documents) (formerly TC-48)
>
Schools
>
1900-1909
>
2774 Report, H.P. Cummings Company to High School House Building Committee, July 22, 1902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 11:16:04 PM
Creation date
10/7/2019 9:57:28 AM
Metadata
Fields
Template:
Archives
Department
Schools
Keywords or Subject
2774 Report, H.P. Cummings Company to High School House Building Committee, July 22, 1902
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iggigil <br /> M <br /> LEXINGTOTT HIGH SCHOOL BUILDING, LEXINGTON, TIJASS. <br /> 7-oston, July 22, 1902. <br /> Alteration 174t). 2 Adding ( see detail below) $4,774. 50 <br /> Amount of Contract of Oct. 231 1901 ) as -110dified by <br /> Alteration No. 1, dated Jan. 12;'11 10029 4(31308. 60 <br /> Amount of Additions, 11�X, 774. 50 <br /> Amount of Contract as modified hereby , 51,083. 10 <br /> For extra excavations and. stonework in fotm-dations, <br /> made necessary in going to sound, hard bottom.,add 767.00 <br /> For changes in connection with side entrances and <br /> coal pocket under front- steps , shown, by details <br /> Nos. 26 , 28, 31 , 33 and 38, 50. 00 <br /> For changes in brickwork, depth of basement, addition- <br /> al iron beams, etc. , due to chap-ging froz grav- <br /> ity to combination heatinr, system, shown by details <br /> "Tos. 269 27 , 34� 35 and Q37Y 20-7. 00 <br /> For engine and ptmD foundations 40. 00 <br /> For oxtra depth of coal pocket 17. 00 <br /> For additional iron beams over coal- pocket 15. 00 <br /> For changes in overhead lights, 3rd floor, substituting <br /> two large for three small ceiling lights , and <br /> PuI-.tin[-; in I-IlIxee addition-al copper skylig-Tits 345. 60 <br /> For fixtures in Physic,-3.1 zaurid Chemical Laboratories as <br /> shown by detail 7o . 49 , and for the plumbing -_--ind <br /> &.18 fittilig in connection with same, ar-d for Lec- <br /> ture room, includirr, also 11� rdware ng and painti 11603. go <br /> a <br /> For sanding all OUTtside wood finish 35. 00 <br /> For plastering the ceilings of basement on wood lath 2420. 00 <br /> For additional electric outlets 35. 20 <br /> For changing doors to fresh air rooms in accordance <br /> with directions of State inspectors 72. 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.