|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-12-04-STE-Referendum-Results
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Elections
>
2010-2019
>
2017
>
2017-12-04-STE-Referendum-Results
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:45:29 PM
Creation date
2/13/2018 11:08:45 AM
Metadata
Fields
Template:
Archives
Year
2017
Author or Source
Nathalie Rice, Town Clerk
Department
Town Clerk
Keywords or Subject
Election Results - Special Town Election - Referendum - Debt Exclusion - New Hastings School - New Lex. Children's Place - Fire State - Temporary Fire Station - Design of new Fire Headquarters (HQ)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OFFICIAL RESULTS <br /> TOWN OF LEXINGTON <br /> SPECIAL ELECTION <br /> DEBT EXCLUSION VOTE <br /> DECEMBER 4, 2017 <br /> PCT 1 PCT 2 PCT 3 PCT 4 PCT 5 PCT 6 PCT 7 PCT 8 PCT 9 TOTAL <br /> TOTAL VOTERS 2106 2569 2102 2504 2576 2397 2432 2329 2509 21524 <br /> Total Votes 556 755 476 759 659 693 680 792 702 6072 <br /> Percent 26% 29% 23% 30% 26% 29% 28% 34% 28% 28% <br /> QUESTION 1 Shall the Town of Lexington be allowed to exempt from the provisions of proposition two and <br /> one-half,so called, the amounts required to pay for the bonds issued in order to pay costs of <br /> design and construction for a new Maria Hastings Elementary School,located at 7 Crosby Road <br /> in Lexington,including the payment of costs for a feasibility study,design development, <br /> demolition,architectural and engineering services,original equipment, furnishings, <br /> landscaping,paving and other site improvements incidental or directly related to such <br /> construction? <br /> PCT 1 PCT 2 PCT 3 PCT 4 PCT 5 PCT 6 PCT 7 PCT 8 PCT 9 <br /> BLANKS 4 1 0 0 0 3 1 0 1 10 <br /> YES 306 452 311 482 381 456 420 579 454 3841 <br /> NO 246 302 165 277 278 234 259 213 247 2221 <br /> QUESTION 2 Shall the Town of Lexington be allowed to exempt from the provisions of proposition two and one- <br /> half,so called, the amounts required to pay for the bonds issued in order to pay costs of design and <br /> construction for a new Lexington Children's Place(LCP),located at 20 Pelham Road in Lexington, <br /> including the payment of costs of demolition, architectural and engineering services,original <br /> equipment, furnishings, landscaping, paving and other site improvements incidental or directly <br /> related to such construction? <br /> PCT 1 PCT 2 PCT 3 PCT 4 PCT 5 PCT 6 PCT 7 PCT 8 PCT 9 <br /> BLANKS 2 2 0 2 4 2 1 4 4 21 <br /> YES 257 392 281 388 308 348 333 485 346 3138 <br /> NO 297 361 195 369 347 343 346 303 352 2913 <br /> QUESTION 3 Shall the Town of Lexington be allowed to exempt from the provisions of proposition two and <br /> one-half,so called. the amounts required to pay for the bonds issued in order to pay costs of <br /> design and construction for a new Headquarters Fire Station,located at 45 Bedford Street in <br /> Lexington,and the design,addition, remodeling,reconstruction and making extraordinary <br /> repairs of a temporary Fire Station located at 171-173 Bedford Street, including the payment of <br /> costs of demolition,architectural and engineering services,original equipment,furnishings, <br /> landscaping,paving and other site and traffic improvements incidental or directly related to <br /> such additions,remodeling,reconstruction,extraordinary repairs and construction? <br />
The URL can be used to link to this page
Your browser does not support the video tag.