|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-12-01-WALKS-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Sidewalk Committee-WALKS
>
Minutes
>
2010-2019
>
2014
>
2014-12-01-WALKS-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 4:11:20 PM
Creation date
3/31/2015 9:32:35 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - WALKS - Sidewalk Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Lexington Sidewalk Committee Meeting Minutes <br />Monday, December 1, 2014, 9 AM <br />Parker Room <br />Present: Jeanne Canale, Judy Crocker, Francine Steiglitz, Craig Weeks; Liaisons present: Elaine <br />Celi, Mark Valenti <br />Craig Weeks called the meeting of the Sidewalk Committee (SWC) to order at 9:05 AM. <br />The Agenda was covered quickly, for the most part. <br />1)Public Comment: Comments and concerns from the community – <br /> Laurel Carpenter presented her findings to the Committee which approved her proposal for <br /> the Pleasant St. sidewalk addition for presentation to the Board of Selectmen’s meeting on <br />th <br /> December 15. <br />2)DPW Update <br /> Mr. Valenti stated that the implementation of the GIS system by the consultant FST was not <br />on schedule, but hoped to be fully complete soon although this database will only reflect <br />existing infrastructure. He suggested a 3-5 year review cycle of the existing sidewalks, noting <br />that the $400k/yr currently budgeted may not be adequate with current costs about $7 per linear <br />foot for new asphalt and $10 for concrete (standard width 5ft). <br /> Mr. Valenti commented that few residents approach the DPW directly for sidewalk repair, <br />receiving only a few requests per year. <br />3)Planning Board Update – nothing reported <br /> A possible sidewalk installation on an unaccepted portion of Colony Rd contiguous to the <br />current sidewalk was discussed as part of a private lot improvement at an October PB meeting. <br />Because the proposed section leads to the Fiske School property, Ms. Crocker spoke of how it <br />would benefit the Safe Routes program. <br />4)LPS Transportation Update <br /> Ms. Celi reported ridership remains high with continued difficulties surrounding after school <br />program start times being so close to the end of the school day that the afterschool transportation <br />program becomes compromised. She continues to seek better cooperation from these independent <br />programs. <br />5)Safe Routes to School Update – still going strong <br /> No action yet on integrating this task: i.e. Should it remain a volunteer position or become a <br />staff responsibility. <br />6) Correspondence Log <br /> A variety of comments regarding the Vinebrook and Winthrop Road Sidewalks were <br />received.. <br />6)Review of Sidewalk Committee charge. <br /> No action yet by the Board of Selectmen to our question as to the value of the SWC to the <br />town and how best our Committee can support the town departments and residents. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.