Laserfiche WebLink
Lexington Sidewalk Committee Meeting Minutes <br />Monday, October 6, 2014 <br />Selectmen's Meeting Room <br />Present: Jeanne Canale, Judy Crocker, Francine Steigitz, Craig Weeks, Mary <br />Hosmer Fanucci;, Liaisons Present: Mark Valenti <br />1. There was no public comment on Vine Brook Road and Pleasant Street. <br />2. Mark is not sure when the sidewalks on Bedford Street will be completed. <br />The engineering is going well. Traffic calming measures are being <br />considered for Shade Street. Speed bumps are an option. The DPW is <br />completing its punch list. Items being worked on included Forest Street <br />and Robinson Road. On Robinson Road would be paved soon. The curb <br />then sidewalk would be completed. The binder course would be <br />completed within one month. <br />Overall, things are quiet at the DPW. <br />Craig Weeks wanted to know the timetable for sidewalks on Shade Street. <br />Mark was not exactly sure. <br />Mark mentioned that he is careful about looking at the linkage between <br />projects. They are always careful to consider how funds are spent. One <br />project mentioned was the connect between Spring Street and Shade <br />Street. The estimate is $66K. There is a curve in the hill, which affects the <br />cost. <br />Connectivity is key to the projects the DPW plans. Marc prefers to do <br />large swaths of sidewalk. Doing small sections in a piecemeal fashion is <br />not cost effective and inefficient. An example of how he likes to work is <br />the sidewalk between Adams and East Street. There was work being done <br />in the area, and it made sense to add the sidewalk to the project. <br />There have been some spot repairs done. Marc was hoping to get to <br />Bedford Street before the frost. The DPW was pushing to get Robinson <br />Road done as well. <br />Francine asked about the status of the Prospect Street sidewalk. Craig <br />indicated that when Bridge School transportation issues are addressed, <br />Prospect Hill sidewalk will get rolled into that discussion. <br />There was also a brief discussion of the GIS. Mark will get an update when <br />data gathering is completed. <br />