Laserfiche WebLink
<br />Cary Memorial Building Renovation and Facilities Improvements <br />1) Make it possible for participants at Town meeting, graduations, lectures and other meetings to be able to <br />hear and understand people when they speak in Battin Hall. Reduce HVAC noise levels, improve hall <br />acoustics, and replace dysfunctional public address and AV technology systems. <br />2) Make all the other meeting rooms in the building function better so they will satisfy high demand for such <br />spaces in Town. Reduce HVAC noise levels, provide 21 century AV technology for presentation and <br />st <br />telecast… in Battin, Estabrook, Ellen Stone, Legion and Bird Rooms., <br />3) Make more spaces accessible to the handicapped by bringing existing facilities up to code and improving <br />others. Replace the exterior entrance ramp, for the first time make the auditorium stage (and Green Room <br />below stage) fully accessible from the floor, make the Bird Room accessible, provide wheelchair seating in <br />the auditorium balcony. This will allow for more of the spaces in the building to be scheduled for public <br />meetings. <br />4) Make the building safer for users by bringing all its life safety systems up to current fire and other building <br />codes. <br />5) Improve the functioning of the heating and air conditioning systems (which also serve the Town Office <br />building) by replacing the 85-year old heating system with current higher efficiency units, and replacing and <br />moving the current higher-than-needed capacity chiller before its predicted life’s end in 6 years. Benefits <br />include reduced operating costs, and reduced noise in the building. <br />6) Replacement of the 1928 public restrooms with new and adequate fixtures which meet the gender unit <br />count (and accessibility) standards for public buildings. <br />7) Improve the functionality of the original Battin Hall stage area for all projected purposes by providing <br />sufficient lighting of it, and by restoring the below-stage area to its original purpose as a “Green Room” for <br />practice, warm-up, dressing and holding of participants when not “on stage”. <br />8) Improve the functionality of the current temporary thrust stage in Battin Hall by making it larger. <br />permanent and integrated with the original stage area. Assure continued use by current committees, <br />schools and organizations and attract new ones for meetings, exhibits and performances, many of which <br />provide rental income partially offsetting the ongoing required maintenance of the building. <br />9) Preserve, improve and restore a unique historic and iconic building in the heart of Lexington Center with <br />respect for its architectural and aesthetic integrity. Fulfill the Town’s commitment to the Cary family for the <br />maintenance of this gift of theirs to us for the “storing and display of historic treasures and the improvement <br />of the moral, intellectual and educational advancement of the community/” <br />10) Make best use ever of Community Preservation Act funds – faithful to the Act’s intent – in improving a <br />facility which already provides a wide range of services to the community, and whose improvement will <br />assure more frequent and extensive use in benefit to the Town.. <br /> <br />