|
Lexington Home Page
|
Help
|
About
|
Browse
Search
5. Estabrook School HSR Feb. 26, 2013
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
BUILDINGS, LAND, UTILITIES & TRANS REPORTS
>
Lexington Public Schools
>
Estabrook School Historic Structure Report, 2013
>
5. Estabrook School HSR Feb. 26, 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2013 4:50:31 PM
Creation date
4/26/2013 4:36:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joseph Estabrook School: Historic Structure Report <br />VII. Plans and Documentary Photographs C5 <br />o T t E v <br />=� II <br />C <br />city a, <br />P fl if P4 �. LlM R 4k CaP6� 4 <br />rPa 4L <br />N o RT NE L E v a _.T iv N <br />- E 4TI 0 N S <br />Elevations, north part of the Estabrook School. Contract Drawing, February 12, 1960. <br />Clinch, Crimp, Brown and Fisher, Architects. <br />MIN "POJIMEN <br />I <br />o T t E v <br />=� II <br />C <br />city a, <br />P fl if P4 �. LlM R 4k CaP6� 4 <br />rPa 4L <br />N o RT NE L E v a _.T iv N <br />- E 4TI 0 N S <br />Elevations, north part of the Estabrook School. Contract Drawing, February 12, 1960. <br />Clinch, Crimp, Brown and Fisher, Architects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.