Laserfiche WebLink
Lexington Sidewalk Committee Meeting Minutes <br />Monday, September 10,2012, 9 AM <br />Selectmen's Meeting Room, Town Office Building <br />Present: Judy Crocker, Jill Hai, Bettina McGimsey, Francine Stieglitz, Jerry van Hook; <br />Liaisons: John Livsey (DPW), Marc Valenti (DPW) <br />The meeting of the Sidewalk Committee (SWC) was called to order at 9:05 AM. <br />1. Update on Membership: Jill Hai is resigning from the SWC as she has been asked to sit <br />on the Town Capital Expenditures Committee. John Davies tenure is up as of this <br />September meeting; he will not be continuing on the committee. Jerry van Hook has <br />agreed to continue with the committee. Judy Crocker is willing to take on the temporary <br />Chair role for the meantime. <br />2. Review of the June 2012 minutes: The June minutes were approved. <br />3. Sidewalk projects during the summer and proposed near term projects by the DPW. John <br />Livsey and Marc Valenti provided an update on the work DPW has been doing with <br />Town sidewalks over the summer. Bettina McGimsey noted that the Hastings <br />Elementary community is very happy with the new sidewalk on the south side of Mass <br />Ave. It was noted that the new Lincoln Street sidewalks have met with approval as well. <br />Mr. Valenti gave an overview of the sidewalk maintenance work his crew has done with <br />FY 12 funding (amounting to nearly one mile of repaired sidewalks): <br />• Maintained the brick pavers downtown <br />• Bloomfield Street from Mass Ave to Eustus: replaced sidewalks, driveway aprons, <br />installed 3 ADA compliant ramps <br />• Rebuilt half of the Worthen/ Middleby pathway <br />• Clarke Street from Raymond to Forest — improved ramps and settlement issues <br />• Transferred some dollars to Engineering to help build sidewalks <br />• Hoping to build a new ramp at Bow and Mass Ave, shifting the crosswalk fromTaft to <br />Bow, as well as improve the Muzzey St. sidewalk with remaining FY12 funding <br />With FYI funding, plans are to install the sidewalk on Winthrop Road, continue <br />downtown paver maintenance, and fix the rest of the Worthen / Middleby path (including <br />fixing some drainage issues and replace the pathway to Baskin Road). Jerry van Hook <br />noted that the path between the Old Res and Bridge Elementary needs to be looked at — <br />both the condition of the path and the need for pruning. Mr. Valenti will check on this. <br />During the next construction season (Spring 2013), there will be water main construction <br />on Bedford Road south from the bike path to Revere Road that will provide an <br />opportunity to redo the sidewalks there. In FY13 or FY14, Mr. Valenti is also hoping to <br />work on Mass Ave from Forest to Clark Street. <br />Francine Stieglitz asked about 57 Baskin Street where the sidewalk has been damaged. <br />Mr. Valenti noted that the home is new and the contractor had done the damage and had <br />not repaired it. The homeowner is planning to ask the contractor to restore the sidewalk <br />when they install the driveway. Mr. Livsey noted that the Town should deal with the <br />contractor since he has pulled a permit with them. Mr. Valenti noted that Baskin Road <br />may be worked on using FY 13 or FY 14 funding anyway. <br />Mr. Livsey gave an update on recent and upcoming sidewalk construction: <br />