Laserfiche WebLink
<br />FY2013 Budget Presentations – December 1, 2011 <br /> <br />Department Goals include: continue with the Hydrant Maintenance Program; continue seeking <br />out the last 2 percent of meters that have not been changed out; implement a backflow/cross <br />connection program; reduce the amount of Pit Meters in Town and change out the manual reads <br />on the ones that cannot be eliminated; and update all the “paper tie cards” for GIS <br />implementation. <br /> <br /> Sewer Enterprise <br />Mr. Hadley presented the FY2013 Sewer Enterprise Budget Requests: Sewer Enterprise <br />$604,289; MWRA $6,866,826; Indirects $623,444. Total Sewer Enterprise Budget $8,094,558. <br /> <br />Department Goals include: continue to rehab and refurbish all 9 pump stations and bring them <br />up to OSHA standards; clear and repair all access routes to all sewer easements; prioritize and <br />repair problem areas; continue pipe flushing program and root removal in all problem areas; and <br />initiate an educational program for the entire Town as to the costs and problems created by <br />Inflow and Infiltration. <br /> <br /> Public Facilities (concluded) <br /> <br />Capital Requests for FY2013: Municipal Building Envelope and Systems $169,711; Muzzey <br />Senior Center upgrade Phase 2 $82,000; White House stabilization and reuse $665,000; Clarke <br />Auditorium lighting and tech upgrade $220,000; Cary Memorial Building upgrades $550,000; <br />DPF ground vehicle $80,000; school building flooring program $125,000; LHS overcrowding – <br />Phase 2 $400,000; school paving program $100,000; school window treatments extraordinary <br />repair $50,000; school locker program (final year) $150,000; Clarke paving improvements for <br />pedestrian and vehicles $65,000; DPF bid documents $75,000; Hastings improvements $87,000; <br />Clarke gymnasium storage area $28,000; energy saving projects $100,000; Hastings natural gas <br />conversion $45,000; Town Wide Facility Master Plan $65,000; school building envelope and <br />systems program $200,000; new loading dock for central office $25,000; and Diamond energy <br />improvements $25,000. <br /> <br />The Selectmen would like further discussion on whether a consultant should be hired to do a <br />Town Wide Facility Master Plan at this time. <br /> <br />The Selectmen will discuss at their December 5 meeting how to prioritize the CPA projects: <br />Muzzey, White House and Cary Memorial Building. The Selectmen requested that gross cost <br />estimate information be included in the packet for December 5. <br /> <br />Mr. Kelley will provide the Selectmen with information on possibly moving the White House to <br />the Leary land on Vine Street to be used for affordable housing. The Selectmen will need to <br />meet with the Historic Districts Commission regarding the possibility of moving the White <br />House from its current site. The Selectmen would like to know the cost to stabilize only the <br />outside of the building. <br /> <br />