Laserfiche WebLink
- proximity to existing regulatory signs <br />- measurement of public street rights of way in various locations requiring sign post <br />installation <br />• Prepare map showing post locations along town streets /sidewalks (Transfer information from <br />general post location map that Keith will prepare). <br />• Confirm Dig Safe details before installing posts on public rights of way <br />6. Sign Types — Pursue discussion of which types of trail signs, i.e. logo or directional, to use as <br />Confirmation type signs until decision is reached. Rick to follow up; Mike T. working on signage <br />— tell him our plans and ask if that will work with his plan. The Town should order the signs if <br />they are to be purchased from Town budget. <br />7. Materials Budget — Follow up with Deb Mauger Rick to follow up; need to know y/n if money <br />available, and if so, when can monies be released for use. <br />Next Steps: <br />By Memorial Day (5/28/12) we hope to: <br />a) have all approvals in place <br />b) finalize and agree on logo <br />c) have money available for project expenses <br />d) have permission from Board of Selectmen to update GCC web page <br />Respectfully submitted, <br />Alexandra Dohan <br />