Laserfiche WebLink
PBC Meeting Minutes <br />12 -15 -11 <br />2.84 Close -Out <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />5/12/11 <br />PBC frustrated that project has not been "closed- out ". DPF shared that frustration and while we have been following some <br />warranty items, plantings, etc. close out has been awaiting the completion of the fluid distribution system and the site as- built. DPF <br />is hopeful that these items are nearly complete and we will be able to "close -out" project. <br />9/8/11 <br />Landscape Architects met on site with owner to review closing order of conditions and are now waiting for small updates to site as- <br />built for completion. <br />12/1/11 <br />Final close -out and payment is forthcoming <br />4.0 Bridge &Bowman Renovation Projects <br />4.10 Phasing Plan <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />8/23/11 <br />Discussion on second shift construction in Central core areas, preferred over regular day shift. It was suggested that all afternoon <br />programming at both schools should be relocated to other buildings during the construction phases. <br />Key dates within the summer construction sequences should be identified and included in the specs sop that there are mid summer <br />milestones to help keep the project on track. <br />PBC still has concern for the phasing and the schedule. <br />9/8/11 <br />Question was asked if there was any thought of putting the administrative area into trailers? Answer is the Administrative staff <br />must be in the building. <br />Updated Phasing plans were reviewed, however there was a disconnect between the architects and the principals in the logistics of <br />swing space for staff within the building to free up administrative or central corridor spaces for renovation. This issue to be <br />reviewed further, however, the overall theme was to allow for construction of portions of the central corridor spaces after the <br />summer break but during off hours or second shift only. <br />PBC asked if laying out the swing space was included the architects work and they confirmed. <br />10/13/11 <br />Jon, Peter and Carl attended a phasing review meeting. A bulleted list of discussion points was developed and distributed. <br />Some of the areas of concern and primary discussion points focused around status of the electrical plans, location of verizon duct <br />bank, abatement work in tunnels. DPC was to send updated electrical plans for additional review. <br />12/1/11 <br />A meeting was held on site with Verizon and it would appear at this time that lines do not have to be moved prior to the <br />contractor being on board. <br />4.11 Window Patterns and Operation <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />9/8/11 <br />DPC has design for double hung —cost in budget +/- -$800, 000. PBC verified that school committee was aware that $10,000 energy <br />benefit on window replacement had about an 80 year payback. <br />10/13/11 <br />Windows in base scope as estimate sits, however PBC can have the windows become an add alternate. <br />12/1/11 <br />The windows are included on the plans as an alternate and the cost savings relative to the base bid is expected to be over the <br />$800,000 due to a lack of abatement needed. <br />4.12 Proiect schedule <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current <br />meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />Page 3 of 8 <br />