PBC Meeting Minutes <br />08 December 2011 Meeting <br />PBC requested info on estimates in Schematic Design. RF Walsh stated that there was one completed by the architect and one <br />completed by Walsh. <br />RF Walsh advised that the MSBA limits reimbursement on site work to +/- 8% of building costs, so town may have reduced <br />reimbursement if site costs are in excess of the limit. <br />10/27/11 <br />It was reported that very early cost modeling was showing the Estabrook project cost in the ballpark of 36 to 37.5 million <br />7.9 Schedule <br />Received schedule 9/15/11, designer agreement should be resolved by early next week. PBC would like to see a copy. <br />10/27/11 <br />March 2012 — MSBA Approval <br />January 2013 - Award Contract for Construction <br />September 2014 - Occupy Building <br />7.9 RF Walsh Update <br />10/27/11 <br />RF Walsh provided an update on project developments, working group meetings, and MSBA issues. <br />• Fire Department drove engine and ladder truck up Robinson road and had no trouble making turn on existing drive into <br />rear of site. <br />• It was noted that the Board of Selectmen do not have to make a vote on the project only the school committee <br />• 2 story or 3 story design options had not been determined as of yet, but PBC will get to see them both. <br />o The expected efficiency of a 3 story scheme was briefly discussed and acknowledged as being more cost <br />efficient as long as it functions for the schools /use. <br />• Educational Program at approx 88,000 sf is being reviewed by MSBA. <br />0 88,000 sf program using $325 / sf translates to 36 to 37 million budget. <br />• Presentations on design option start in November. <br />• TMMA meeting scheduled for 11/3 <br />7.10 CM at Risk versus Design Bid Build <br />10/27/11 <br />There was discussion on the pros and cons of CM at Risk contracts. <br />It was discussed that decisions on CM at Risk may need to be made no later than December. <br />PBC requested a table of responsibilities be developed to demonstrate Pro's and Cons of CM at Risk versus conventional bid /build. <br />11/17/11 <br />RF Walsh reviewed power point on differences in delivery method. <br />DPF raised discussion points on why having a CM at risk could be beneficial to the project and the Town especially on scheduling <br />issues. <br />Issues discussed, risk, schedule, cost, phasing & logistics, process <br />It was agreed that a decision needed to be made by December as there are several steps to go thru to get CM on board. <br />PBC asked for consultants to prepare updated schedule that shows impact of CM at Risk and Early site work with milestones, as <br />discussion indicated there should be schedule benefits but they are not shown on schedule presented. <br />Also, to have RF Walsh distribute the RFQ for CM at Risk as PBC review may help decision process. <br />12/1/11 <br />There was continued discussion on the pros and cons of CM at Risk although no decisions have been made as there are still <br />questions over cost impact and benefit to schedule. A PBC member has volunteered to contact RF Walsh and develop a way to <br />document or better define the pro's and cons or responsibilities and perhaps costs for the next PBC meetings review. <br />12/8/11 <br />There was continued discussion on the CM @ Risk process which included the review of a table of data presented by RF Walsh <br />on the shifting of responsibilities of participants in the project management process as well as financial and scheduling impacts. <br />Given the potential of negligible cost differentials and potential improvement to scheduling and tighter document development <br />the PBC elected to continue the project with the CM at Risk process. <br />Motion to approve and implement the Construction Manager @ Risk process on the Estabrook School project, understanding <br />that improvements to scheduling, document and construction control provided through the construction manager at risk process <br />will be an added benefit to the project. <br />Motion: Phil Coleman 2" d : Dick Perry Vote: Unanimous <br />Page 6 of 8 <br />