|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-01-24-STE-Referendum-Results
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Elections
>
2010-2019
>
2012
>
2012-01-24-STE-Referendum-Results
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 3:43:59 PM
Creation date
3/15/2012 8:45:11 AM
Metadata
Fields
Template:
Archives
Year
2012
Author or Source
Donna Hooper, Town Clerk
Department
Town Clerk
Keywords or Subject
Election Results - Special Town Election - Referendum - Debt Exclusion - Bridge School Renovation - Bowman School Renovation - New Estabrook School
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Election —January 24, 2012 <br /> Pct 1 Pct 2 Pct 3 Pct 4 Pct 5 Pct 6 Pct 7 Pct 8 Pct 9 TOTAL <br /> Total Registered Voters 2134 2483 2126 2502 2635 2475 2415 2316 2349 21435 <br /> Total Votes 458 793 420 749 598 695 781 604 628 5726 <br /> Percent 21% 32% 20% 30% 23% 28% 32% 26% 27% 27% <br /> QUESTION 1 <br /> Shall the Town of Lexington be allowed to exempt from the provisions of Proposition two and one-half, <br /> so-called, the amounts required to pay for the bond issued in order to pay the costs of remodeling, <br /> reconstructing and making extraordinary repairs to the Bridge and Bowman Schools, including the <br /> payment of costs of architectural and engineering services, original equipment and landscaping, paving <br /> and other site improvements incidental or directly related to such remodeling, reconstruction or repair? <br /> Pct 1 Pct 2 Pct 3 Pct 4 Pct 5 Pct 6 Pct 7 Pct 8 Pct 9 TOTAL <br /> YES 252 594 306 514 331 445 546 393 375 3756 <br /> NO 205 196 112 232 267 247 224 209 253 1945 <br /> BLANKS 1 3 2 3 0 3 11 2 0 25 <br /> QUESTION 2 <br /> Shall the Town of Lexington be allowed to exempt from the provisions of Proposition two and one-half, <br /> so called, the amount required to pay for the bond issued in order to pay for planning, constructing, <br /> originally equipping and furnishing a new Estabrook School on the current Estabrook School site, <br /> including the payment of costs of architectural and engineering services, playground and athletic <br /> fields, paving, other site improvements incidental or directly related to the project? <br /> Pct 1 Pct 2 Pct 3 Pct 4 Pct 5 Pct 6 Pct 7 Pct 8 Pct 9 TOTAL <br /> YES 269 626 320 564 366 515 625 438 417 4140 <br /> NO 189 165 98 182 230 178 154 165 209 1570 <br /> BLANKS 0 2 2 3 2 2 2 1 2 16 <br /> A true copy. <br /> Attest: <br /> Donna M. Hooper, Town Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.