Laserfiche WebLink
Special Election —January 24, 2012 <br /> Pct 1 Pct 2 Pct 3 Pct 4 Pct 5 Pct 6 Pct 7 Pct 8 Pct 9 TOTAL <br /> Total Registered Voters 2134 2483 2126 2502 2635 2475 2415 2316 2349 21435 <br /> Total Votes 458 793 420 749 598 695 781 604 628 5726 <br /> Percent 21% 32% 20% 30% 23% 28% 32% 26% 27% 27% <br /> QUESTION 1 <br /> Shall the Town of Lexington be allowed to exempt from the provisions of Proposition two and one-half, <br /> so-called, the amounts required to pay for the bond issued in order to pay the costs of remodeling, <br /> reconstructing and making extraordinary repairs to the Bridge and Bowman Schools, including the <br /> payment of costs of architectural and engineering services, original equipment and landscaping, paving <br /> and other site improvements incidental or directly related to such remodeling, reconstruction or repair? <br /> Pct 1 Pct 2 Pct 3 Pct 4 Pct 5 Pct 6 Pct 7 Pct 8 Pct 9 TOTAL <br /> YES 252 594 306 514 331 445 546 393 375 3756 <br /> NO 205 196 112 232 267 247 224 209 253 1945 <br /> BLANKS 1 3 2 3 0 3 11 2 0 25 <br /> QUESTION 2 <br /> Shall the Town of Lexington be allowed to exempt from the provisions of Proposition two and one-half, <br /> so called, the amount required to pay for the bond issued in order to pay for planning, constructing, <br /> originally equipping and furnishing a new Estabrook School on the current Estabrook School site, <br /> including the payment of costs of architectural and engineering services, playground and athletic <br /> fields, paving, other site improvements incidental or directly related to the project? <br /> Pct 1 Pct 2 Pct 3 Pct 4 Pct 5 Pct 6 Pct 7 Pct 8 Pct 9 TOTAL <br /> YES 269 626 320 564 366 515 625 438 417 4140 <br /> NO 189 165 98 182 230 178 154 165 209 1570 <br /> BLANKS 0 2 2 3 2 2 2 1 2 16 <br /> A true copy. <br /> Attest: <br /> Donna M. Hooper, Town Clerk <br />