|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-11-18-Bridge-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
School Councils
>
Bridge School
>
Minutes
>
2010-2019
>
2011
>
2011-11-18-Bridge-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2011 11:17:29 AM
Creation date
12/19/2011 11:17:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 29, 2011 from 7 to 9pm. She is an author and family life educator. <br />There will be flyers given to parents. Meg showed two sample flyers. <br />3. Technology <br />Tom Plati has a three to five year plan for the schools. All the <br />administrators will be coming together to talk about the needs at all schools. He <br />is looking for funding from the School Committee. Smart boards will be given to <br />grades three to five if there is funding. There are many infrastructure issues at <br />Bridge and the renovation will address some of these with updated wiring. <br />Meg said that some teachers have been frustrated by slowness of the <br />Internet, not being totally wireless and with the maintenance of some computers. <br />Our Tech Aide at Bridge (Ann Tenhor) has been great about giving support. <br />Teachers have been encouraged to write LEF grants. <br />4. Susan asked if after the renovation vote, there can be some focus on <br />multicultural signs that parents and children can make. There could be welcome <br />signs in different languages to be hung up. Meg noted that there is a need for <br />another flag to be made because a student has been asking her for a flag. Jenny <br />volunteered to look at the specifications that Rebecca has. <br />5. Recycling <br />Jenny said that the recycling has been going very well and is done every day. <br />Staff, Lucia and Erin specifically, and students have been helpful and have done <br />a great job. <br />Next Meeting: December 16, 2011 at 8:00am <br />
The URL can be used to link to this page
Your browser does not support the video tag.