Laserfiche WebLink
<br />to take the full lane should be conveyed to drivers, perhaps through a notice in the <br />tax bill. Laurel will bring a sample. <br /> <br />DCR Grant for Minuteman Bikeway User Information (Update): <br /> Peggy is <br />seeking others to help write an RFP for the architectural design work. During the <br />period of the grant, volunteer efforts will be part of the matching funds and will <br />reduce the cost of the project. <br /> <br />Plans for Bikeway Drainage and Root Control: <br /> Bids are going out for root <br />control. If the roots cannot be eliminated this fall, the committee unanimously <br />approved a motion to request that these be shaved down as a safety measure. <br /> <br />Bikeway Intersection Safety Upgrades <br />: No progress to report. <br /> <br />Bike Racks: <br /> Marita and Peggy met with Chris Filadoro to explain to him the <br />process and locations of the nine “U” shaped racks. These will be installed this <br />fall. David Pinsonneault will advise Chris on the installation of the 6-foot bike <br />racks. The Lexington Historical Society agreed to have a rack at the Monroe <br />Tavern. Because this location, (private property) does not conform to the MAPC <br />guidelines, the Friends of Lexington Bikeways will buy one rack for them. Marita <br />will meet with Susan Bennett. <br /> <br />Bikeway Counts <br />: Margaret Stebbins reported 4.110 users on Saturday, <br />September 10 between 7 a.m. and 7 p.m. On Tuesday, September 10 there were <br />1,144 users between 7-9:30, noon-1, and 4 to 7. <br /> <br />Center Streetscape: <br /> Jerry distributed a letter in support of having a medium strip <br />between Grant and Woburn. He felt at the present time there is some pushback <br />on this plan in this section. Richard Canale supports one lane in each direction <br />throughout the center. Sandra Shaw supports the streetscape plan as presented <br />last month. Bob Hausslein commented on how well one lane works in Central <br />Square. Arlington is proceeding with one lane is East Arlington so that will give <br />Lexington some indication of the success on traffic flow with one lane and turning <br />lanes. <br /> <br /> <br />Record of the Discussions of the Friends of Lexington Bikeways <br /> <br />Treasurer’s report: <br /> Bob reported a balance of $10,476.06. A women’s jogging <br />group has contributed $1,124, to be used for plowing. <br /> <br />Bikeway Plowing: <br /> George will order additional snow plowing donation signs from <br />Vista Print. <br /> <br /> <br />