Laserfiche WebLink
ARTICLE 8 (f) <br />Project: Battle Green Master Plan Implementation, Phase I <br />CPA Category: Historic Resources <br />Amount Requested: $50,000 <br />Amount Recommended: $50,000 <br />CPC Vote: (8-1) <br />Project Description: <br />This request by the Tourism Committee is for $50,000 for the first phase in a recommended three-year <br />implementation program for improvements proposed in the Battle Green Area Master Plan. <br />Specifically, CPA funds will be used to improve path material and restore edges at the base of several <br />of the monuments in the Battle Green Area, repair damaged fencing surrounding some of the <br />monuments, and, contingent upon Selectmen approval, allow for the restoration of the Hayes <br />Memorial Fountain. This project will be coordinated with the project submitted by the Department of <br />Public Works to restore monuments in the Battle Green Area. <br />Project Goals and Objectives: <br />The 2010 Town Meeting authorized $25,000 of CPA funds to hire a consultant to prepare a Master <br />Plan for the Battle Green Area. Several drafts of the Master Plan were prepared, and a final Plan was <br />conditionally approved, by the Selectmen in March, 2011. The Plan defined the boundaries of the <br />Battle Green Area to include the Battle Green, Belfry Hill, Ye Olde Burying Ground, Buckman <br />Tavern and the Lexington Visitor Center. The Plan made recommendations for site improvements and <br />management of the Battle Green Area, including conserving monuments and statues, and establishing <br />unified design standards for paths, vegetation, benches, trash receptacles, signs, interpretive panels, <br />lighting and other site furnishings. The goal of this request is to begin to address these <br />recommendations. <br />Project Benefit: <br />The Battle Green is a nationally significant landmark which draws hundreds of thousands of visitors to <br />Lexington each year, the fourth most popular tourist destination in Massachusetts after Boston, <br />Cambridge and Salem. The Battle Green is also the Town common for the citizens of Lexington. <br />Improvements proposed for the Battle Green Area will enhance both visitor and citizen appreciation <br />and will encourage proper use of this highly significant area. This first-year funding request is being <br />th <br />submitted so that improvements can be made prior to the commencement of the Town’s 300 <br />anniversary celebration in 2013. <br />Funding Request: <br />The FY 12 funding request for this project is $50,000 which represents a portion of the first phase of <br />Battle Green Area improvements. Subsequent implementing steps will proceed at the discretion of the <br />Selectmen with the help of an advisory committee to be appointed by them. Total cost for the Battle <br />Green Area improvements recommended in the Master Plan is estimated at approximately $921,000. <br />Phase 2, which includes a pedestrian, traffic and parking study and additional path improvements, is <br />estimated at $221,000. Phase 3, which includes implementation of the recommendations of the traffic <br />study, improvement of site furnishings, implementation of planting recommendations and <br />improvement of landscape conditions on Belfry Hill, is estimated at $600,000. Opportunities are <br />available for matching grants for this work through State, Federal and private funding sources. Future <br />requests for CPA funding will be determined as part of a comprehensive funding program which takes <br />these potential sources of revenue into account. <br />13 <br /> <br />