Laserfiche WebLink
1 775 <br />c <br />v a <br />unm � <br />TOWN OF LEXINGTON, MASSACHUSETTS' <br />PERMANENT BUILDING COMMITTEE <br />Minutes of Tuesday October 7 2003 meeting at the Lexington High School Trailer. ' <br />Permanent Building Committee member Jonathan Himmel called the meeting to order at 7:25 ' <br />p.m. with other PBC members, Mary Lou Touart and Bruce Creager present. Also in attendance <br />the Owner's Representative, Bill Kealy, Project Manager, Carl Oldenburg, Project Coordinator <br />and Gary Kaczmarek, Clerk of Works. Representing the Capital Expenditures Committee, <br />Charles Lamb. From Dale Gienapp Design, Architect, Dale Gienapp. <br />D. Gienapp introduced Northeast's Payment Requisition No 4 in the amount of $122 <br />Gienapp told the PBC that there is concern about two rooms to be tested because of noise in <br />adjacent areas; that the punchlist was updated the end of September and is 95% complete; <br />amplified sound equipment and head sets are to be ordered; and that general amplification of the <br />sound equipment remains to be done. In answer to a question from J. Himmel, Gienapp said that <br />we are owed the marked up drawings. The motion to approve payment of Payment Requisition <br />No. 4 was made by J. Himmel and seconded by M. Touart. All were in favor to pay $122,262.00 <br />to Northeast. <br />Next Northeast's Change Order No 3 for $17,304.48 was brought to the table by D Gienapp J. <br />Himmel made the motion to approve payment of Change Order No. 2 in the amount of <br />$17,304.48. It was seconded by B. Creager and all were in favor to pay. <br />B. Kealy signed an Amendment to the Contract between Dale Gienapp Design and the Owner <br />Gienapp explained that the monetary increase was due to additional architectural work required <br />because mechanical and electrical systems were not well documented and as- builts that were not <br />accurate making it necessary for the Architects to physically investigate previous construction. <br />B. Kealy asked the Committee to pay Eastern's Payment Requisition No 37 totaling $25 <br />forwarded by HMFH The motion to pay Payment Requisition No. 37 was made by J. Himmel <br />and seconded by M. Touart with all in favor to pay. <br />Subsequently Kealy requested that Peabody's Payment Requisition No 43 forwarded by <br />HMFH, in the amount of $96 620 00 be paid J. Himmel made the motion to pay the Requisition <br />in the amount of $96,620.00. M. Touart seconded the motion and all were in favor to pay. <br />Kealy noted that he is trying to closeout both the High School and Middle School projects; and <br />that, the Town's legal counsel has been told to send notices to both Peabody Construction and <br />Eastern Construction to either complete the jobs or the Town will take the monies owed and <br />finish the projects. <br />Alexandra's Payment Requisition No 27 for $411,826.76 was presented by B Kealy Kealy <br />stated that S. Hale sent a letter to his office regarding the changes made to the requisition. A <br />motion was made by J. Himmel to pay the Requisition in the amount of $411,826.76. It was <br />seconded by B. Creager with all were in favor to pay. <br />In place of the Architect B Kealy solicited approval of Pavrnent Requisition No 3 for Castagna <br />Construction totaling $241 Kealy told the PBC that progress has been made on A- <br />Building, although there are problems with B- Building because of the discovery of unsuitables. <br />He added that he is anticipating a claim for approximately $120,000.00 because of the <br />