Laserfiche WebLink
S A , <br />9 <br />TOWN OF LEXINGTON, MASSACHUSETTS <br />PERMANENT BUILDING COMMITTEE <br />Minutes of Tuesday December 9, 2003 meeting at the Lexington High School Trailer. <br />Permanent Building Committee member Philip Poinelli called the meeting to order at 7:10 P.M. <br />with other PBC members, Mary Lou Touart, Richard Sperandio, Jonathan Himmel, Dick Perry <br />and Peter Johnson present. Also in attendance the Owner's Representative, Bill Kealy, Project <br />Manager, and Carl Oldenburg, Project Coordinator. <br />In the absence of the architects B. Kealy began by soliciting approval of Payment Requisition <br />No. 5 for Castawia Construction for the amount of $691,273.94 Kealy told the PBC that a geo- <br />grid has been completed filling and securing a hole caused by the drilling of one of the wells. He <br />said that the steel is up in buildings A and B; all the foundations have been completed; and that, <br />tarps will be going up in A- building for the use of temporary heat so that the decks can be poured. <br />Kealy also stated that the site is not as pristine, as thought, creating the need for many loads of <br />buildable fill. The GC is claiming the cost of the buildable fill to $!20,000.00. Kealy has made a <br />counter offer of $40,000.00. A motion was made by P. Poinelli to pay the requisition in the <br />amount of $691,273.94 and seconded by M. Touart. All were in favor to pay. <br />Next Kealy introduced Castagna's Change Order No 1 for the sum of $26,741.53 P. Poinelli <br />recommended that the CO have a better breakdown of hours, rates, and material costs. P. Poinelli <br />made the motion to pay the Change Order for the corrected math amount of $26,741.53. J. <br />Himmel seconded and all were in favor to pay the CO. <br />Kealy then asked the Committee to approve payment of Northeast's Payment Requisition No 6 <br />totaling $35,063.00 Kealy reported that the project is close to finishing, but there are problems <br />with noise in adjacent rooms. The DBA has not been met in five rooms. A motion was made by <br />P. Poinelli to pay the requisition. it was seconded by P. Johnson and all were in favor to pay. <br />Kealy presented Northeast's Chan e Order CO) No 5 for $20,411.18 P. Poinelli made the <br />motion to approve payment of the CO. J. Himmel seconded the motion and all were in favor to <br />pay. <br />Subsequently Kealy sought payment for Alexandra's Payment Requisition No 29 for the <br />amount of $419,497.46 Kealy explained that the most work remaining is on the lower level, the <br />second level is being worked on and the upper level has the carpets and doors installed and the <br />painting completed. Exterior painting, landscaping and repairs to the soffit remain to be done, <br />once the weather allows the work to continue. P. Johnson pointed out that Time & Material line <br />item on the cover sheet should be changed to the corresponding CCD in order for it to tie in with <br />the back page. P. Johnson made the recommendation to pay Requisition No. 29 with the <br />correction made from Time & Material to the correct CCD. P. Poinelli seconded the motion and <br />all were in favor to pay. <br />Kealy brought Alexandra's CO No 14 to the table for the sum of $16,657.20 D. Perry made the <br />motion to pay the CO and P. Poinelli seconded the motion. All were in favor to pay Alexandra <br />$16,657.20. <br />Finally, Kealy asked the Committee to approve payment of Camdele's Payment Requisition No <br />1 for $39,939.95 D. Perry noted that the requisition contained costs for bleachers and was <br />concerned that the bleachers are handicapped accessible. Both P. Johnson and P. Poinelli stated <br />that the bleachers should be written up as a Change Order, J. Himmel suggested that Camdele <br />