|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-11-30-ProposedRenHandougBRBO30Nov10
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Ad hoc Townwide Facilities Master Planning Committee - TFMP
>
Reports
>
2010-11-30-ProposedRenHandougBRBO30Nov10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 4:03:26 PM
Creation date
1/20/2011 9:14:58 AM
Metadata
Fields
Template:
Archives
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bridge and Bowman Renovation Project <br />Sub - Committee for Bridge and Bowman and parent volunteer participants <br />Carl Oldenburg, PBC Member Designee to Project <br />Jen Volgelzang, Liaison from School Department to PBC for Project <br />Brigitte Steines, Bridge Parent volunteer participant <br />Cindy Darcy, Bridge Parent volunteer participant <br />Kara Brandes Bowman Parent volunteer participant <br />Betsy Wilkenson Bowman Parent volunteer participant <br />Mary Anton, Principal Bowman School <br />Meg Colella, Principal Bridge School <br />The 2010 Annual Town Meeting approved funding in support of the recommendations for the Bridge & <br />Bowman renovation project. A sub - committee was formed, as identified above, to work with the architects to <br />incorporate these recommendations into design documents. The result of this process has culminated in an <br />approximate $325,000 savings of the current project costs versus the planned budget first estimated prior to <br />spring 2010 town meeting. <br />While the master plan base scope or 0 -10 yr. priority matrix addresses the deferred maintenance issues at <br />both schools, the sub - committee identified additional recommendations to improve utilization of the building <br />over the next 20 years. <br />• The addition of a fire suppression system must be added to the project to meet current codes. <br />• The outright removal of HVAC unit ventilators from classrooms and installation of a centralized <br />ventilation system that will reduce classroom noise and improve air quality while still realizing energy <br />goals and reducing operating expenses. <br />• The incorporation of tempering of ventilation air to provide "partial cooling" or humidity reduction is <br />expected to provide more comfortable air temperatures of 78 -80 degrees in classrooms and improve <br />occupant comfort without the costs of full air - conditioning which stops at 74 degree cooling. <br />• The addition of two new classrooms (per school) by moving the boiler room function supports a rising <br />enrollment at these schools which is contrary to the master plans predicated enrollment decline. <br />• The addition of two more classrooms (per school) by modifying spaces allocated to administration also <br />supports the enrollment increases, and also enhances building entry security. <br />• New lighting systems and controls contribute to the energy efficiencies of the building and improve <br />overall lighting quality. <br />• Installation of network wiring and power distribution for planned technology improvements, facilitates <br />implementation of the technology plan for the schools. <br />These recommendations should be considered to realize the Bridge and Bowman project as a 20 year building <br />solution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.