<br /> <br />9.Stone Building Exterior Stabilization <br />- Mr. Pat Goddard, Director of <br />Facilities, presented this project for $202,933. He gave a brief background of <br />the project, and stated that the Historic Structures Report had been <br />completed, and was the basis for the requested $202,933. Although there was <br />approximately $122,000 to $130,000 remaining in the FY 2010 budget from <br />a previous CPA appropriation, Mr. Goddard explained that he felt it would be <br />“cleaner” to return these funds, and commence in FY11 with a new <br />appropriation. There were no questions on this project. <br /> <br /> <br /> <br />10.Town Office Building Renovation <br /> - Mr. Mark Barrett, Project Manager <br />from the Facilities Department, addressed this application for $1,933,947. <br />Mr. Barrett gave a brief history of the project and explained that the proposed <br />work entailed bringing the building up to code from the standpoint of ADA <br />accessibility and fire safety, and relocating certain offices to increase <br />efficiency. The ADA work would include the installation of handicapped <br />accessible bathrooms and counters, installation of a ramp at the front of the <br />building, and a handicapped accessible door on the Post Office side of the <br />building. Mr. Sandy said he recalled an appropriation for handicapped <br />bathrooms a few years earlier, which Mr. Barrett replied had not been spent. <br />Mr. Sandy also asked why there was a need for a handicapped entrance on <br />the east side of the building (facing the Post Office) when there was no <br />handicapped parking on that side of the building. Mr. Barrett responded that <br />the handicapped entrance had been suggested by the architect. Mr. Kanter of <br />the CEC, asked Mr. Barrett if the previous ADA appropriation for the <br />bathrooms was included in the $1,933,947 figure. Mr. Barret replied that it <br />was not, and would be additive to the project. (There is presently <br />approximately $49,000 left in this FY09 appropriation for the ADA bathroom <br />work.) <br /> <br /> <br /> <br />11.Cary Library Preservation Project - Archives - <br /> Ms. Connie Rawson, <br />Director of the Library, spoke to this request for $100,000 for the conversion <br />of an existing storage room into a climate controlled vault for historic <br />document storage. She explained the need for the vault, and said that $10,000 <br />would be devoted to design work, with the remainder devoted to the <br />construction of the vault. There were no questions regarding this project. <br /> <br /> <br /> <br />12.Building Envelope <br /> – Mr. Goddard addressed this request for $73,000 for <br />roof repairs to Cary Hall, restoration of architectural details to the top of the <br />Cary Memorial Building, related work, and updating of the Massachusetts <br />Historical Commission Form B. There were no questions on this project. <br /> <br /> <br />13.Muzzey Senior Center Improvements Study <br /> - Mr. Goddard also addressed <br />this project which requested $45,100 in CPA funds. He explained that the <br />4 <br /> <br /> <br />