|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1999-07-BOS-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Select Board-SB (formerly Selectmen, Board of-BOS)
>
Minutes
>
1990-1999
>
1999
>
1999-07-BOS-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 12:57:16 PM
Creation date
9/29/2010 4:20:47 PM
Metadata
Fields
Template:
Archives
Department
Selectmen
Keywords or Subject
BOS - Board of Selectmen
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
61-386 <br />Selectmen's Meeting Minutes <br />July 26, 1999 <br />A regular meeting of the Board of Selectmen was held on Monday, July 26, 1999 in the <br />Selectmen's Meeting Room, Town Office Building at 7:30 p.m. Chairman Enrich, Mrs. Eddison, <br />Mrs. Krieger, Mrs. Abbott, Mrs. McKenna; Mr. White, Town Manager; and Ms. Smith, <br />Executive Clerk were present. <br />Hearings <br />Boston Edison Representative Carol McManus was present to request the following two grant of <br />locations: <br />Marrett Road <br />The work is necessary to provide underground electric service to a new house at 490 Marrett <br />Road. A permit has been issued by the Mass. Highway Department. <br />Upon motion duly made and seconded, it was voted to approve the petition of the Boston Edison <br />Company to lay and maintain underground conduits and manholes, with the wires and cables to <br />be placed therein, under the surface of Marrett Road southerly, approximately 105 feet west of <br />Tufts Road, a distance of about 10 feet. <br />Battleview Circle <br />The work is necessary in order to replace the existing underground direct buried cable with new <br />conduit in Battleview Circle. <br />Upon motion duly made and seconded, it was voted to approve the petition of Boston Edison <br />Company to lay and maintain underground conduits and manholes, with the wires and cables to <br />be placed therein, under the surface of Battleview Circle: Install conduit southerly, <br />approximately 10 feet south of Young Street, thence turning and running southwesterly a <br />distance of about 298 feet. <br />Consent Agenda <br />Upon motion duly made and seconded, it was voted to approve the following: <br />Commitment of water charges for 6/22/99 (cycle 03) $421,263.15 <br />Commitment of sewer charges for 6/22/99 (cycle 03) $878,311.65 <br />Adjustment of water charges for 12/1/98 to 12/31/98 $81.40 <br />Adjustment of sewer charges for 12/1/98 to 12/31/98 $172.60 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.