APPROPRIATION COMMITTEE PRELIMINARY REPORT TO STM2 NOVEMBER2006 <br />Introduction <br />Because of potentially conflicting timing issues, the Article to allow Town Meeting to appropriate funds <br />for a new Department of Public Works (DPW) facility is being addressed in a separate Special Town <br />Meeting. Our preliminary analysis and recommendation are given below. <br />Warrant Article Analysis and Recommendation <br />Article 2: Appropriate <br />Funds Requested <br />Funding <br />Committee <br />For A DPW <br />Source <br />Recommendation <br />Unknown <br />GF (see discussion <br />Approve (94) only <br />Facility <br />regarding debt- <br />reasonable funding to <br />exclusion <br />complete bid -ready <br />referendum) <br />construction documents <br />The DPW barn, where the bulk of the DPW vehicles and other equipment is stored every evening until <br />the next morning, is over 100 years old. Virtually none of the larger DPW facility is less than 40 years <br />old. A number of studies have consistently concluded that the facility is too small, is in terrible shape, is a <br />very inefficient work place, and is not in compliance with many aspects of current State and Federal <br />codes not the least of which is accessibility. It is clear that the DPW facility is not adequate for the <br />Town's needs and there is little argument about whether it needs to be replaced. Any debate, at this time, <br />is about the scope of the project and other details.' <br />Unlike construction of a new school building where there is often more limited discussion of the project <br />scope and its impact on the operations of the school, the scope of the plans for a new DPW facility has <br />been questioned. Many of the questions are reasonable and should be answered carefully so that Town <br />officials and residents can be confident that any appropriation for a new facility has been thoroughly <br />reviewed in light of the very significant costs that will be incurred. <br />Just as the current facility has served the Town for decades, we can reasonably expect a new DPW facility <br />to last more than 50 years. The annual operating budget of the DPW is over $8M and that total includes <br />more than $3M in compensation for Town employees. In ballpark terms, over the life of a new facility the <br />Town will spend more than $150M for DPW employee compensation (in 2006 dollars). In the same time <br />period, $25M to $50M will be spent on DPW equipment (at $500K to $1M a year). Currently, the annual <br />cost of heat and electricity for the DPW facility is roughly $50K. The energy costs in a new facility could <br />rise significantly (in current year rather than in inflated dollars) because the planned new facility will be <br />much larger than the current one and it will likely be better ventilated and better lit. On the other hand, it <br />is being designed to minimize energy use (better insulation, etc.). If we speculate that the annual energy <br />costs remain near the current level, the total expenditure on energy over 50 years will be on the order of <br />$5M and could be much higher if energy costs rise, as is likely. The cost of maintenance of the facility <br />itself will be roughly $500K per year (using 2% of replacement value as a rule of thumb), or $25M over <br />50 years. <br />Clearly, any effects of the new facility on employee productivity (as well as on that of DPW contractors), <br />on costs of facility and equipment maintenance and replacement, and on energy usage, ought to be taken <br />into account together with the cost of building a new facility. Therefore, this Committee is concerned with <br />life -cycle costs. <br />Background information on the DPW facility project may be found online at <br />< ) http:// www. lexingtont mma. or_/ Documents06 /STMDPWPresentationI106.Rdf <br />